Project intelligenceTDLR TABS2025012443New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sulphur Springs ISD- New ES 1

829 Bell St., Sulphur Springs, TX, 75482

Construction complete · Aug 2026Inspection Complete

Sulphur Springs ISD- New ES 1 is a new construction project at 829 Bell St., Sulphur Springs, in Hopkins County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $55.0M across about 110,000 sq ft.

Estimated project value
$55.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
110,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$500/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 21, 2025552 days across supplied datesAug 27, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    451 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Sulphur Springs ISD- New ES 1

Sulphur Springs ISD has completed the construction of a new elementary school at 829 Bell St. in Sulphur Springs. The project, filed as New ES 1, covers 110,000 square feet of new construction. The building passed its final TDLR accessibility inspection in August 2026, confirming that the physical build-out is complete.

The estimated cost for this project was $55,000,000. This places the project above the county median for new construction in Hopkins County, where the median estimated cost is $975,000. The cost per square foot is $500, which is also above the county median of $124 per square foot. The scheduled build window was 91 days, shorter than the county median of 238 days for similar filings.

Design and Registration

Huckabee is the design firm of record for this project. The registered accessibility specialist is Ross A Thomas. The project was registered with TDLR in February 2025. Plan review was completed in the same month. The filing indicated a construction start date of March 2025 and a completion date of June 2025. The final inspection passed in August 2026, updating the status to Inspection Complete.

Sulphur Springs ISD is the owner of record. The district has four other TDLR-registered projects in the area, including the Douglas Early Education Center and Jim Bowie Elementary School. These other projects also have inspection complete status. The total value of these other district projects is $68,517,805. Huckabee has six other registered projects totaling $136,100,000, including facilities in Jarrell and Gatesville.

The site is located in Hopkins County, ZIP code 75482. Census estimates for this area indicate a population of about 26,086. The median household income is $64,049. There are approximately 10,896 housing units, with most being owner-occupied. The median owner-occupied home value is $202,600. Nearby businesses include Exxon, Hopkins Court, and League Street Church of Christ.

The project involves public funds and public land. The TDLR record confirms the accessibility compliance of the new structure. The construction phase is finished, and the building has met the state's accessibility standards. This completes the physical development process for this specific elementary school facility.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75482 (Sulphur Springs)

One email per change. Unsubscribe in one click. Privacy.

Sulphur Springs ISD- New ES 1 is a New Construction project located at 829 Bell St., Sulphur Springs, TX 75482 in Sulphur Springs, Texas. The project has an estimated value of $55.0M covering 110,000 sq ft. Sulphur Springs ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on February 21, 2025.

Frequently Asked Questions

Is the new elementary school at 829 Bell St. open for enrollment?

The TDLR record confirms the construction is complete and the final TDLR accessibility inspection passed in August 2026. However, the record does not state if the school is open for enrollment or operating.

Who designed the New ES 1 project?

Huckabee is the design firm of record for the New ES 1 project. The registered accessibility specialist for the filing is Ross A Thomas.

What is the square footage of the new school?

The new elementary school at 829 Bell St. is 110,000 square feet. The estimated cost was $55,000,000, resulting in a cost of $500 per square foot.

When was the final inspection completed?

The final TDLR accessibility inspection was passed in August 2026. The project was registered with TDLR in February 2025, and plan review was completed in the same month.

Is this project part of a larger district initiative?

Yes, Sulphur Springs ISD has four other TDLR-registered projects totaling $68,517,805. These include the Douglas Early Education Center and Jim Bowie Elementary School, both of which are also inspection complete.

What is Sulphur Springs ISD- New ES 1?

Sulphur Springs ISD- New ES 1 is a new construction project at 829 Bell St. in Sulphur Springs, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New elementary school for Sulphur Springs ISD

Is Sulphur Springs ISD- New ES 1 open in Sulphur Springs?

Construction on Sulphur Springs ISD- New ES 1 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Sulphur Springs ISD- New ES 1 located?

Sulphur Springs ISD- New ES 1 is located at 829 Bell St., Sulphur Springs, TX, 75482, in Hopkins County.

Who is the owner or developer of Sulphur Springs ISD- New ES 1?

Sulphur Springs ISD is the property owner/developer of record for Sulphur Springs ISD- New ES 1, per its TDLR project registration.

Who is the architect or design firm for Sulphur Springs ISD- New ES 1?

Huckabee is the design firm of record for Sulphur Springs ISD- New ES 1, according to its TDLR filing.

How much does Sulphur Springs ISD- New ES 1 cost and how big is it?

Sulphur Springs ISD- New ES 1 has an estimated construction value of $55.0M and approximately 110,000 square feet (about $500/sqft), based on its TDLR filing.

Scope of Work

New elementary school for Sulphur Springs ISD

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

829 Bell St., Sulphur Springs, TX, 75482

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75482 (Sulphur Springs)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Sulphur Springs?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.