Project intelligenceTDLR TABS2025012501Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Best Stop Gas Station

28677 I-45 South, Spring, TX, 77381

Target date passed (Nov 2025)Project Registered

Best Stop Gas Station is a renovation/alteration project at 28677 I-45 South, Spring, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $310K across about 4,139 sq ft.

Estimated project value
$310K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,139 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$75/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 21, 2025262 days across supplied datesNov 10, 2025

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    73 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    189 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Best Stop Gas Station

A $310,425 renovation of the Best Stop Gas Station at 28677 I-45 South in Spring is registered with TDLR. The project involves the remodel of an existing convenience store, specifically including facade renovation, for a total of 4,139 sq ft. The estimated cost works out to $75 per square foot.

Sohail Ali is the owner of record for this Montgomery County project. MB&B Architects & Engineers serves as the design firm, and Sasha G Mote is the registered accessibility specialist. The work is classified as a renovation or alteration on privately funded land.

Timeline and Status

The project was registered with TDLR in February 2025. The filing listed a construction start date of May 2025 and a target completion date of November 2025. That completion date has passed. However, no plan review or inspection has been recorded since registration. Therefore, whether the construction proceeded as scheduled is not confirmed in the public record.

Local Context

This project is one of several registered renovations in the area. Nearby registered projects include 9303 New Trails, Timberloch Place, and 6 Pines. The site is located in ZIP code 77381, where the U.S. Census estimates a population of about 35,184 and a median household income of $142,210. Local businesses near the site include BJ's Restaurant & Brewhouse, Buca di Beppo Italian Restaurant, and Buffalo Wild Wings.

In Montgomery County, the median estimated cost for renovation or alteration filings is $248,088. This project's cost is above that county median. The median size for similar filings is 3,232 sq ft, while this project is larger at 4,139 sq ft. The scheduled build window of 189 days is longer than the county median of 92 days. The cost per square foot of $75 is close to the county median of $85.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77381 (Spring)

One email per change. Unsubscribe in one click. Privacy.

Best Stop Gas Station is a Renovation/Alteration project located at 28677 I-45 South in Spring, Texas. The project has an estimated value of $310K covering 4,139 sq ft. Sohail Ali is the property owner and MB&B Architects & Engineers is the design firm of record. The project was registered with TDLR on February 21, 2025.

Frequently Asked Questions

Who is the owner of the Best Stop Gas Station renovation?

Sohail Ali is the owner of record for this project, registered in Montgomery County.

What is the scope of the work at 28677 I-45 South?

The scope includes the remodel of an existing convenience store, specifically a facade renovation.

Is the project finished?

The target completion date of November 2025 has passed, but no plan review or inspection has been recorded, so completion is not confirmed.

Who is the design firm for this project?

MB&B Architects & Engineers is the design firm of record for the renovation.

What is Best Stop Gas Station?

Best Stop Gas Station is a renovation/alteration project at 28677 I-45 South in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of an existing convenience store including facade renovation

Is Best Stop Gas Station open in Spring?

Best Stop Gas Station was scheduled to finish construction in Nov 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Best Stop Gas Station located?

Best Stop Gas Station is located at 28677 I-45 South, Spring, TX, 77381, in Montgomery County.

Who is the owner or developer of Best Stop Gas Station?

Sohail Ali is the property owner/developer of record for Best Stop Gas Station, per its TDLR project registration.

Who is the architect or design firm for Best Stop Gas Station?

MB&B Architects & Engineers is the design firm of record for Best Stop Gas Station, according to its TDLR filing.

How much does Best Stop Gas Station cost and how big is it?

Best Stop Gas Station has an estimated construction value of $310K and approximately 4,139 square feet (about $75/sqft), based on its TDLR filing.

Scope of Work

Remodel of an existing convenience store including facade renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

28677 I-45 South, Spring, TX, 77381

30.18055, -95.45294

Watch all construction in 77381 (Spring)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.