Project intelligenceTDLR TABS2025012561Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Columbus High School CTE Addition

103 Cardinal Lane, Columbus, TX, 78934

Construction complete · Aug 2026Inspection Complete

Columbus High School CTE Addition is a additions to existing building project at 103 Cardinal Lane, Columbus, in Colorado County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $5.3M across about 10,674 sq ft.

Estimated project value
$5.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,674 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$492/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 24, 2025548 days across supplied datesAug 26, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    98 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    245 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    205 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Columbus High School CTE Addition

The Columbus High School CTE Addition is a completed construction project located at 103 Cardinal Lane in Columbus, Texas. This new free-standing metal building adds 10,674 square feet of career and technical education space to the existing campus. The project passed its final TDLR accessibility inspection in August 2026, confirming that construction is complete.

Columbus Independent School District is the owner of record for this development. The estimated cost for the work was $5,255,542. This figure places the project above the county median for similar additions to existing buildings in Colorado County. The computed cost per square foot is $492, which is close to the county median of $449 per square foot for this type of work.

Scope and Construction Details

The scope of work included two major components: the CTE addition and additional site-related work. The CTE addition is a new free-standing metal building designed to house career and technical education programs. The project was registered with the Texas Department of Licensing and Regulation in February 2025. Plan review was completed in the same month, with construction starting in June 2025.

The scheduled build window was 245 days, which is close to the county median of 214 days for similar projects. The registered accessibility specialist for this project is William T Winning. The project involved public funds and public land, consistent with its status as a school district improvement. The final inspection was passed in August 2026, marking the official completion of the construction phase.

Context from the surrounding area indicates a stable community. Census estimates for ZIP code 78934 show a population of about 6,833 residents. The median household income is $66,177, and the median owner-occupied home value is $215,400. Housing in the area is predominantly owner-occupied. The Colorado County unemployment rate was 4.1 percent in July 2026.

Other projects by Columbus Independent School District include the Columbus Elementary School renovation and the Columbus ISD Softball Field. These projects reflect the district's ongoing investment in local infrastructure. The Columbus High School CTE Addition stands as a significant addition to the educational facilities in Colorado County.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78934 (Columbus)

One email per change. Unsubscribe in one click. Privacy.

Columbus High School CTE Addition is a Additions to Existing Building project located at 103 Cardinal Lane, Columbus, TX 78934 in Columbus, Texas. The project has an estimated value of $5.3M covering 10,674 sq ft. Columbus Independent School District is the property owner. The project was registered with TDLR on February 24, 2025.

Frequently Asked Questions

Is the Columbus High School CTE Addition open?

The construction is complete. The project passed its final TDLR accessibility inspection in August 2026. The record confirms the building is finished, though specific opening dates for public use are not listed in the TDLR filing.

How much did the Columbus High School CTE project cost?

The estimated cost for the Columbus High School CTE Addition was $5,255,542. This amount is above the county median for similar additions to existing buildings in Colorado County.

What is the size of the new CTE building?

The new free-standing metal building adds 10,674 square feet to the campus. This size matches the county median for similar projects in Colorado County.

Who is the registered accessibility specialist for this project?

William T Winning is the registered accessibility specialist for the Columbus High School CTE Addition. He is listed in the TDLR filing for this project.

When did construction finish for the CTE addition?

Construction was completed in August 2026. The project passed its final TDLR accessibility inspection in that month, confirming the end of the construction phase.

What is Columbus High School CTE Addition?

Columbus High School CTE Addition is a additions to existing building project at 103 Cardinal Lane in Columbus, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope of work at the campus includes two major components: a career and technical education (CTE) and additional site related work. The career and technical education (CTE) addition is a new free-standing metal building.

Is Columbus High School CTE Addition open in Columbus?

Construction on Columbus High School CTE Addition is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Columbus High School CTE Addition located?

Columbus High School CTE Addition is located at 103 Cardinal Lane, Columbus, TX, 78934, in Colorado County.

Who is the owner or developer of Columbus High School CTE Addition?

Columbus Independent School District is the property owner/developer of record for Columbus High School CTE Addition, per its TDLR project registration.

How much does Columbus High School CTE Addition cost and how big is it?

Columbus High School CTE Addition has an estimated construction value of $5.3M and approximately 10,674 square feet (about $492/sqft), based on its TDLR filing.

Scope of Work

The scope of work at the campus includes two major components: a career and technical education (CTE) and additional site related work. The career and technical education (CTE) addition is a new free-standing metal building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

103 Cardinal Lane, Columbus, TX, 78934

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78934 (Columbus)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Columbus?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.