Project intelligenceTDLR TABS2025012660New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Denton Fire Station #6

2301 Hunter's Creek, Denton, TX, 76210

Opening ~Nov 2026Review Complete

Denton Fire Station #6 is a new construction project at 2301 Hunter's Creek, Denton, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $9.7M across about 13,231 sq ft.

Estimated project value
$9.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
13,231 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$732/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 25, 2025619 days across supplied datesNov 6, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    84 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    535 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Denton Fire Station #6

Fire Station 6 is a new construction project located at 2301 Hunter's Creek in Denton, Texas. The City of Denton is the owner of record for this facility, which spans 13,231 square feet. The estimated cost for the building and site work is $9,687,431, resulting in a cost of $732 per square foot. This figure is above the county median of $121 per square foot for similar new construction filings in Denton County.

TDLR completed plan review in February 2025 and construction is scheduled to finish in November 2026, with work starting May 2025. The project is registered with the Texas Department of Licensing and Regulation under the name Denton Fire Station #6. The status is Review Complete, and the registered accessibility specialist is Jeffrey A Gutknecht. The design firm of record is Martinez Architects, which has also been involved in other municipal and institutional projects across the state.

Project Scale and Context

The 535-day scheduled build window is longer than the county median of 219 days for new construction projects. The estimated cost places this project in the top quarter of Denton County filings, which have a median estimated cost of $900,000. The City of Denton has six other TDLR-registered projects totaling $22,281,816, including the Linda McNatt Animal Care & Adoption Center and Briercliff Park. This fire station project represents a significant portion of that total municipal investment in public infrastructure.

Martinez Architects, the design firm for this project, has six other TDLR-registered projects totaling $18,654,315. These include Willowfork Fire Station 3 in Katy and the Spring Fire Department Administration Building in Spring. The firm’s portfolio demonstrates experience with emergency services facilities and other public structures. The project involves public funds and public land, ensuring transparency in the use of resources for this essential community service.

Other registered projects in the same area include Victory Shops @ Hickory Creek and Beach Club Car Wash, both new construction projects. The ZIP code 76210 has a population of about 46,790 and a median household income of $108,438 according to U.S. Census estimates. The median owner-occupied home value is $348,400, reflecting a stable residential community. This new fire station will serve this population, enhancing emergency response capabilities in the region.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76210 (Denton)

One email per change. Unsubscribe in one click. Privacy.

Denton Fire Station #6 is a New Construction project located at 2301 Hunter's Creek, Denton, TX 76210 in Denton, Texas. The project has an estimated value of $9.7M covering 13,231 sq ft. City of Denton is the property owner and Martinez Architects is the design firm of record. The project was registered with TDLR on February 25, 2025.

Frequently Asked Questions

Where is Fire Station 6 located?

Fire Station 6 is located at 2301 Hunter's Creek in Denton, Texas 76210.

Who is building Fire Station 6?

The City of Denton is the owner of record, and Martinez Architects is the design firm of record.

What is the estimated cost of Fire Station 6?

The estimated cost is $9,687,431 for the new construction of the building and site.

When will Fire Station 6 be finished?

Construction is scheduled to finish in November 2026, with work starting in May 2025.

Is Fire Station 6 open?

The TDLR record shows construction is scheduled to finish in November 2026, so it is not yet open.

What is Denton Fire Station #6?

Denton Fire Station #6 is a new construction project at 2301 Hunter's Creek in Denton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Construction of Building and Site.

Is Denton Fire Station #6 open in Denton?

Denton Fire Station #6 is still under construction in Denton, TX, with an estimated completion of Nov 2026 according to its TDLR registration.

Where is Denton Fire Station #6 located?

Denton Fire Station #6 is located at 2301 Hunter's Creek, Denton, TX, 76210, in Denton County.

Who is the owner or developer of Denton Fire Station #6?

City of Denton is the property owner/developer of record for Denton Fire Station #6, per its TDLR project registration.

Who is the architect or design firm for Denton Fire Station #6?

Martinez Architects is the design firm of record for Denton Fire Station #6, according to its TDLR filing.

How much does Denton Fire Station #6 cost and how big is it?

Denton Fire Station #6 has an estimated construction value of $9.7M and approximately 13,231 square feet (about $732/sqft), based on its TDLR filing.

Scope of Work

New Construction of Building and Site.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2301 Hunter's Creek, Denton, TX, 76210

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76210 (Denton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.