Phase 14B Street Reconstruction
Bogard Drive/Dunn Drive; Lamar Street; Kean Circle, The Colony, TX, 75056
Phase 14B Street Reconstruction is a renovation/alteration project at Bogard Drive/Dunn Drive; Lamar Street; Kean Circle, The Colony, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Sep 2026. The project has an estimated value of $4.5M across about 27,622 sq ft.
- Estimated project value
- $4.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 27,622 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $161/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 8mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
10 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
582 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75056 (The Colony)
One email per change. Unsubscribe in one click. Privacy.
Phase 14B Street Reconstruction is a Renovation/Alteration project located at Bogard Drive/Dunn Drive; Lamar Street; Kean Circle, The Colony, TX 75056 in The Colony, Texas. The project has an estimated value of $4.5M covering 27,622 sq ft. City of The Colony is the property owner and Cobb, Fendley & Associates, Inc. is the design firm of record. The project was registered with TDLR on February 25, 2025.
Frequently Asked Questions
What is Phase 14B Street Reconstruction?
Phase 14B Street Reconstruction is a renovation/alteration project at Bogard Drive/Dunn Drive; Lamar Street; Kean Circle in The Colony, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: econstruction of roadways, sidewalks with barrier free ramps, driveways, and utilities on three streets. Total SF of sidewalk removal/replacement = 27,622 SF; BFR removal/replacement = 1,970 SF.
Is Phase 14B Street Reconstruction open in The Colony?
Phase 14B Street Reconstruction is still under construction in The Colony, TX, with an estimated completion of Sep 2026 according to its TDLR registration.
Where is Phase 14B Street Reconstruction located?
Phase 14B Street Reconstruction is located at Bogard Drive/Dunn Drive; Lamar Street; Kean Circle, The Colony, TX, 75056, in Denton County.
Who is the owner or developer of Phase 14B Street Reconstruction?
City of The Colony is the property owner/developer of record for Phase 14B Street Reconstruction, per its TDLR project registration.
Who is the architect or design firm for Phase 14B Street Reconstruction?
Cobb, Fendley & Associates, Inc. is the design firm of record for Phase 14B Street Reconstruction, according to its TDLR filing.
How much does Phase 14B Street Reconstruction cost and how big is it?
Phase 14B Street Reconstruction has an estimated construction value of $4.5M and approximately 27,622 square feet (about $161/sqft), based on its TDLR filing.
Scope of Work
econstruction of roadways, sidewalks with barrier free ramps, driveways, and utilities on three streets. Total SF of sidewalk removal/replacement = 27,622 SF; BFR removal/replacement = 1,970 SF.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Bogard Drive/Dunn Drive; Lamar Street; Kean Circle, The Colony, TX, 75056
Related Projects
Same Owner
$97.5M totalWatch all construction in 75056 (The Colony)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in The Colony?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.