Project intelligenceTDLR TABS2025012764Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Mr Cooper

8950 Cypress Waters Blvd, Coppell, TX, 75019

Construction complete · Aug 2026Project Closed

Mr Cooper is a renovation/alteration project at 8950 Cypress Waters Blvd, Coppell, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $7.2M across about 82,216 sq ft.

Estimated project value
$7.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
82,216 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$88/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 25, 2025527 days across supplied datesAug 6, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    154 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    233 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    127 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75019 (Coppell)

One email per change. Unsubscribe in one click. Privacy.

Mr Cooper is a Renovation/Alteration project located at 8950 Cypress Waters Blvd, Coppell, TX 75019 in Coppell, Texas. The project has an estimated value of $7.2M covering 82,216 sq ft. Billingsley Company is the property owner and Perkins&Will is the design firm of record. The project was registered with TDLR on February 25, 2025.

Frequently Asked Questions

What is Mr Cooper?

Mr Cooper is a renovation/alteration project at 8950 Cypress Waters Blvd in Coppell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: PHASE 1 INTERIOR RENOVATION OF OFFICE LEASE SPACE ON LEVELS 2 & 3 OF AN EXISTING 3-STORY OFFICE BUILDING. PHASE 2 SHALL BE PERMITTED SEPARATELY AND RENOVATION SCOPE WILL BE ON LEVELS 1 & 2.

Is Mr Cooper open in Coppell?

Construction on Mr Cooper is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Mr Cooper located?

Mr Cooper is located at 8950 Cypress Waters Blvd, Coppell, TX, 75019, in Dallas County.

Who is the owner or developer of Mr Cooper?

Billingsley Company is the property owner/developer of record for Mr Cooper, per its TDLR project registration.

Who is the architect or design firm for Mr Cooper?

Perkins&Will is the design firm of record for Mr Cooper, according to its TDLR filing.

How much does Mr Cooper cost and how big is it?

Mr Cooper has an estimated construction value of $7.2M and approximately 82,216 square feet (about $88/sqft), based on its TDLR filing.

Scope of Work

PHASE 1 INTERIOR RENOVATION OF OFFICE LEASE SPACE ON LEVELS 2 & 3 OF AN EXISTING 3-STORY OFFICE BUILDING. PHASE 2 SHALL BE PERMITTED SEPARATELY AND RENOVATION SCOPE WILL BE ON LEVELS 1 & 2.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

8950 Cypress Waters Blvd, Coppell, TX, 75019

Location by street address

Watch all construction in 75019 (Coppell)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.