Project intelligenceTDLR TABS2025012806New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Lubbock-Cooper High School - New Competition Gym

910 Woodrow Rd., Lubbock, TX, 79423

Opening ~Mar 2027Review Complete

Lubbock-Cooper High School - New Competition Gym is a new construction project at 910 Woodrow Rd., Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $18.5M across about 43,000 sq ft.

Estimated project value
$18.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
43,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$430/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 26, 2025733 days across supplied datesMar 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    419 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    314 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Lubbock-Cooper High School - New Competition Gym

Lubbock-Cooper High School is adding a new 43,000-square-foot competition gym at 910 Woodrow Rd. in Lubbock, Texas. The project, filed as the New Competition Gym, represents a significant expansion of the existing high school facility in Lubbock County. This new construction is scheduled to finish in March 2027, following a start date of April 2026.

The estimated cost for this addition is $18,500,000, which works out to $430 per square foot. The scope of work includes a sunken athletic gym, bowl seating, concession areas, and basement-level locker rooms and storage. This build is part of a broader investment by Lubbock-Cooper Independent School District, which has six other TDLR-registered projects totaling $67,800,000 in the area.

Design and Registration Details

Parkhill is the design firm of record for the project. Stephen D Macphie serves as the registered accessibility specialist. The project was registered with TDLR in February 2025, and plan review was completed in the same month. The status is Review Complete, with construction slated to begin in April 2026. The use of public funds and public land is noted in the filing, reflecting the public nature of the school district’s infrastructure development.

In comparison to other new construction filings in Lubbock County, this project’s cost is above the county median. The median estimated cost for similar filings is $797,300, while this gym addition is significantly larger in both scale and budget. The scheduled build window of 314 days is longer than the county median of 244 days, reflecting the complexity of the new athletic and storage facilities being added to the existing school structure.

The surrounding area includes other construction activity and businesses such as Griffin's Contracting and Jack and Jill Donuts. The ZIP code 79423 has a population of about 44,357, with a median household income of $82,906 according to U.S. Census estimates. This project fits into a broader pattern of educational infrastructure updates in Lubbock, where several other school-related projects are also registered or closed.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79423 (Lubbock)

One email per change. Unsubscribe in one click. Privacy.

Lubbock-Cooper High School - New Competition Gym is a New Construction project located at 910 Woodrow Rd., Lubbock, TX 79423 in Lubbock, Texas. The project has an estimated value of $18.5M covering 43,000 sq ft. Lubbock-Cooper Independent School District is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on February 26, 2025.

Frequently Asked Questions

When is construction scheduled to start and finish?

Construction starts in April 2026 and is scheduled to finish in March 2027.

What features are included in the addition?

The addition includes a sunken athletic gym, bowl seating, concessions, and basement locker rooms.

Is the project currently open for public use?

The project is under construction and is not yet open for public use.

What is Lubbock-Cooper High School - New Competition Gym?

Lubbock-Cooper High School - New Competition Gym is a new construction project at 910 Woodrow Rd. in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approximately 43,000 sq ft addition to existing high school. Addition includes sunken athletic gym, bowl seating, concession, and basement level locker rooms and storage.

Is Lubbock-Cooper High School - New Competition Gym open in Lubbock?

Lubbock-Cooper High School - New Competition Gym is still under construction in Lubbock, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is Lubbock-Cooper High School - New Competition Gym located?

Lubbock-Cooper High School - New Competition Gym is located at 910 Woodrow Rd., Lubbock, TX, 79423, in Lubbock County.

Who is the owner or developer of Lubbock-Cooper High School - New Competition Gym?

Lubbock-Cooper Independent School District is the property owner/developer of record for Lubbock-Cooper High School - New Competition Gym, per its TDLR project registration.

Who is the architect or design firm for Lubbock-Cooper High School - New Competition Gym?

Parkhill is the design firm of record for Lubbock-Cooper High School - New Competition Gym, according to its TDLR filing.

How much does Lubbock-Cooper High School - New Competition Gym cost and how big is it?

Lubbock-Cooper High School - New Competition Gym has an estimated construction value of $18.5M and approximately 43,000 square feet (about $430/sqft), based on its TDLR filing.

Scope of Work

Approximately 43,000 sq ft addition to existing high school. Addition includes sunken athletic gym, bowl seating, concession, and basement level locker rooms and storage.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

910 Woodrow Rd., Lubbock, TX, 79423

Location by street address

Watch all construction in 79423 (Lubbock)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.