Structural Repairs Building 35 in Galveston, TX
19320 West San Luis Pass, Galveston, TX, 77554
Structural Repairs Building 35 is a renovation/alteration project at 19320 West San Luis Pass, Galveston, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.0M across about 36,000 sq ft.
- Estimated project value
- $1.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 36,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $28/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
11 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
91 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Structural Repairs Building 35
Structural repairs to Building 35 at the Seaside Resort in Galveston are the focus of a $1,000,000 renovation project filed with the Texas Department of Licensing and Regulation. The work, located at 19320 West San Luis Pass, encompasses 36,000 square feet of the property, specifically targeting the floor system and walkways. This filing is registered under the project name Structural Repairs Building 35, identifying the owner of record as Holiday Inn Club Vacations, Inc.
The construction timeline for this alteration was compressed, with a scheduled start in February 2025 and a planned completion in June 2025. This 102-day build window is close to the county median of 120 days for similar renovation and alteration filings in Galveston County. While the estimated cost places the project in the top quarter of comparable local filings, the cost per square foot of $28 remains below the county median of $74 for this type of work.
Engineering and Ownership Context
Childress Engineering Services, Inc. served as the design firm of record for this structural intervention. The firm has registered six other projects with TDLR, ranging from apartment leasing centers to medical center parking structures. Holiday Inn Club Vacations, Inc. also holds two other closed TDLR registrations for the Seaside Resort, each valued at $1,200,000, indicating a pattern of significant capital investment in this specific Galveston property.
The project is privately funded on private land for private use. Richard Todd Lozano is the registered accessibility specialist associated with the filing. TDLR completed the plan review in March 2025, clearing the way for the physical construction work that began the previous month. The scope is strictly defined as structural repairs, distinguishing it from the new construction projects often seen in the surrounding coastal area.
Despite the scheduled completion date of June 2025 having passed, the public record reflects a specific administrative gap. TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. This status means that while the planned work was substantial, the official closure of the project in the state registry remains pending. Readers should note that construction status and business operations are distinct; the absence of a final inspection does not provide information on whether the resort is open to the public.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77554 (Galveston)
One email per change. Unsubscribe in one click. Privacy.
Structural Repairs Building 35 is a Renovation/Alteration project located at 19320 West San Luis Pass, Galveston, TX 77554 in Galveston, Texas. The project has an estimated value of $1.0M covering 36,000 sq ft. Holiday Inn Club Vacations, Inc. is the property owner and Childress Engineering Services, Inc. is the design firm of record. The project was registered with TDLR on March 3, 2025.
Frequently Asked Questions
What is the status of the final inspection for Building 35?
TDLR has not yet recorded a final inspection. Although the scheduled completion date was June 2025, the public record does not confirm the site's current state or official project closure.
Who is the owner of the Seaside Resort in Galveston?
Holiday Inn Club Vacations, Inc. is the owner of record. The company has two other closed TDLR registrations for this resort, each valued at $1,200,000.
What specific work was done to Building 35?
The scope of work involved structural repairs to the building, specifically targeting the floor system and walkways. The total area covered by this renovation is 36,000 square feet.
Is the Seaside Resort currently open to the public?
The TDLR record only tracks construction and accessibility compliance. It does not confirm whether the business is open or operating. The lack of a final inspection does not indicate operational status.
Who designed the structural repairs for this project?
Childress Engineering Services, Inc. is the design firm of record. They are responsible for the engineering aspects of the 36,000-square-foot renovation of the floor system and walkways.
What is Structural Repairs Building 35?
Structural Repairs Building 35 is a renovation/alteration project at 19320 West San Luis Pass in Galveston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Structural repairs to the building including the floor system and walkways. 36,000 Sq. Ft.
Is Structural Repairs Building 35 open in Galveston?
Structural Repairs Building 35 was scheduled to finish construction in Jun 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Structural Repairs Building 35 located?
Structural Repairs Building 35 is located at 19320 West San Luis Pass, Galveston, TX, 77554, in Galveston County.
Who is the owner or developer of Structural Repairs Building 35?
Holiday Inn Club Vacations, Inc. is the property owner/developer of record for Structural Repairs Building 35, per its TDLR project registration.
Who is the architect or design firm for Structural Repairs Building 35?
Childress Engineering Services, Inc. is the design firm of record for Structural Repairs Building 35, according to its TDLR filing.
How much does Structural Repairs Building 35 cost and how big is it?
Structural Repairs Building 35 has an estimated construction value of $1.0M and approximately 36,000 square feet (about $28/sqft), based on its TDLR filing.
Scope of Work
Structural repairs to the building including the floor system and walkways. 36,000 Sq. Ft.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
19320 West San Luis Pass, Galveston, TX, 77554
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$60.9M totalWatch all construction in 77554 (Galveston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Galveston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.