Evans Park Spray Zone Site Improvements is a renovation/alteration project at 1112 Hillcrest Street, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $250K across about 1 sq ft.
- Estimated project value
- $250K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $250.00K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
35 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
115 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
399 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Evans Park Spray Zone Site Improvements
The Evans Park Playground renovation in Mesquite is complete. The project, filed as Evans Park Spray Zone Site Improvements, passed its final TDLR accessibility inspection in September 2026. This confirms that the exterior improvements at the City of Mesquite's Evans Park recreation center are finished and compliant with Texas accessibility standards.
Located at 1112 Hillcrest Street in Dallas County, the site received new paving, updated site lighting, and a new irrigation system. A key feature of this scope is the irrigation system, which utilizes water reclaimed from a water spray pad installed by the city under a separate project. This design approach integrates water efficiency into the park's infrastructure while enhancing the outdoor experience for visitors.
The City of Mesquite - Parks and Recreation Department served as the owner of record for this renovation. GSR Andrade Architects was the design firm of record, guiding the project from plan review to completion. Marcela Abadi Rhoads was the registered accessibility specialist associated with the filing. The project was registered with TDLR in March 2025, with plan review completed in the same month. Construction was scheduled to begin in April 2025 and was slated for completion by July 2025, though the final inspection occurred later in September 2026.
Project Scope and Costs
The estimated cost for this renovation was $250,000. This figure is close to the median estimated cost of $248,000 for renovation and alteration filings in Dallas County. The scheduled build window of 115 days was also close to the county median of 92 days. The project involved public funds and public land, reflecting the city's investment in maintaining its recreational spaces.
This geographic detail is relevant for understanding the site's environmental context. The area surrounding the park includes several local businesses and residential communities, contributing to the neighborhood's character. The completion of this project marks a significant update to the Evans Park facilities, ensuring they meet current standards for accessibility and functionality.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75149 (Mesquite)
One email per change. Unsubscribe in one click. Privacy.
Evans Park Spray Zone Site Improvements is a Renovation/Alteration project located at 1112 Hillcrest Street, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $250K covering 1 sq ft. City of Mesquite - Parks and Recreation Department is the property owner and GSR Andrade Architects is the design firm of record. The project was registered with TDLR on March 3, 2025.
Frequently Asked Questions
Is the Evans Park Playground renovation complete?
Yes, the project passed its final TDLR accessibility inspection in September 2026. The TDLR status is listed as Inspection Complete, confirming that the construction work is finished.
What improvements were made to Evans Park?
The renovation included new paving, site lighting, and a new irrigation system. The irrigation system uses water reclaimed from a city-installed water spray pad, integrating water efficiency into the park design.
Who was the design firm for this project?
GSR Andrade Architects was the design firm of record. Marcela Abadi Rhoads served as the registered accessibility specialist for the TDLR filing.
What was the estimated cost of the project?
The estimated cost was $250,000. This amount is close to the median estimated cost of $248,000 for similar renovation and alteration filings in Dallas County.
When did the project start and finish?
Construction was scheduled to start in April 2025. The final TDLR accessibility inspection was passed in September 2026, marking the official completion of the project.
What is Evans Park Spray Zone Site Improvements?
Evans Park Spray Zone Site Improvements is a renovation/alteration project at 1112 Hillcrest Street in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Exterior improvements of the City of Mesquite's Evans park recreation center including new paving, site lighting, and new irrigation system across the site that utilizes water reclaimed from a water spray pad that the city is installing…
Is Evans Park Spray Zone Site Improvements open in Mesquite?
Construction on Evans Park Spray Zone Site Improvements is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.
Where is Evans Park Spray Zone Site Improvements located?
Evans Park Spray Zone Site Improvements is located at 1112 Hillcrest Street, Mesquite, TX, 75149, in Dallas County.
Who is the owner or developer of Evans Park Spray Zone Site Improvements?
City of Mesquite - Parks and Recreation Department is the property owner/developer of record for Evans Park Spray Zone Site Improvements, per its TDLR project registration.
Who is the architect or design firm for Evans Park Spray Zone Site Improvements?
GSR Andrade Architects is the design firm of record for Evans Park Spray Zone Site Improvements, according to its TDLR filing.
How much does Evans Park Spray Zone Site Improvements cost and how big is it?
Evans Park Spray Zone Site Improvements has an estimated construction value of $250K and approximately 1 square feet (about $250.00K/sqft), based on its TDLR filing.
Scope of Work
Exterior improvements of the City of Mesquite's Evans park recreation center including new paving, site lighting, and new irrigation system across the site that utilizes water reclaimed from a water spray pad that the city is installing under another
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1112 Hillcrest Street, Mesquite, TX, 75149
Related Projects
Same Owner
$204.0M totalWatch all construction in 75149 (Mesquite)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mesquite?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.