Project intelligenceTDLR TABS2025013244Additions to Existing Building
Funding type

This project is privately funded, on private land for private use.

Patient Tower and Ancillary Services Expansion in San Antonio, TX

1139 Sonterra Blvd., San Antonio, TX, 78258

Target date passed (Jun 2026)Review Complete

Patient Tower and Ancillary Services Expansion is a additions to existing building project at 1139 Sonterra Blvd., San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $65.5M across about 83,785 sq ft.

Estimated project value
$65.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
83,785 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$782/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 4, 2025476 days across supplied datesJun 23, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    111 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Patient Tower and Ancillary Services Expansion

The Patient Tower and Ancillary Services Expansion at 1139 Sonterra Blvd. in San Antonio is a major construction project for Methodist Hospital Stone Oak. The filing details a horizontal and vertical expansion intended to add 73,707 sq ft of new construction and 10,078 sq ft of renovation. This work will create additional ancillary services space, a new medical/surgical patient unit, and a new ICU unit. The total project size is 83,785 sq ft with an estimated cost of $65,500,000.

Methodist Hospital Stone Oak is the owner of record for this development in the Stone Oak area of Bexar County. The design firm of record is Earl Swensson Associates, Inc. The project is privately funded on private land for private use. The registered accessibility specialist for the filing is Christopher David Fielden.

TDLR completed the plan review in March 2025. Construction was scheduled to begin in June 2025 with a completion date listed as June 2026 on the filing. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The status is listed as Review Complete, but the lack of a final inspection means the physical completion of the work is not verified in the public accessibility records.

Context and Comparisons

This project is significantly larger than typical additions in the region. Among 1,051 TDLR-registered additions to existing buildings in Bexar County, the median estimated cost is $475,000 and the median size is 3,870 sq ft. This project's cost is above the county median for its type, placing it in the top quarter of filings. The scheduled build window of 365 days is longer than the county median of 184 days. The cost per square foot is $782, which is above the county median of $166 per square foot.

Methodist Hospital Stone Oak has six other TDLR-registered projects totaling $7,680,000, all located in San Antonio and marked as closed. Earl Swensson Associates, Inc. has worked on six other projects totaling $54,326,495, including facilities in Georgetown, Austin, Frisco, and Spring. Local permit records at this address show 24 permits issued between January 2025 and October 2026, including plumbing, electrical, and site work permits. The most recent permit on file involves site work for a new detention pond.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78258 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

Patient Tower and Ancillary Services Expansion is a Additions to Existing Building project located at 1139 Sonterra Blvd., San Antonio, TX 78258 in San Antonio, Texas. The project has an estimated value of $65.5M covering 83,785 sq ft. Methodist Hospital Stone Oak is the property owner and Earl Swensson Associates, Inc. is the design firm of record. The project was registered with TDLR on March 4, 2025.

Frequently Asked Questions

Is the expansion complete?

TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The filing listed a completion date of June 2026, but the lack of a final inspection means physical completion is not verified.

Who is designing the project?

Earl Swensson Associates, Inc. is the design firm of record for this expansion. They are also the design firm for other healthcare projects in Texas, including St. David's Medical Center in Austin and Legacy ER & Urgent Care in Frisco.

What is the total cost of the project?

The estimated cost is $65,500,000. This is above the county median for additions to existing buildings in Bexar County, which is $475,000. The cost per square foot is $782, compared to a county median of $166.

What specific facilities are being added?

The project will provide 73,707 sq ft of new construction and 10,078 sq ft of renovation. This includes additional ancillary services square footage, a new medical/surgical patient unit, and a new ICU unit.

What is Patient Tower and Ancillary Services Expansion?

Patient Tower and Ancillary Services Expansion is a additions to existing building project at 1139 Sonterra Blvd. in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Horizontal and Vertical Expansion to provide additional ancillary services square footage, new M/S patient unit and new ICU unit. The project will provide 73,707sf of new construction and 10,078 sf of renovation.

Is Patient Tower and Ancillary Services Expansion open in San Antonio?

Patient Tower and Ancillary Services Expansion was scheduled to finish construction in Jun 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Patient Tower and Ancillary Services Expansion located?

Patient Tower and Ancillary Services Expansion is located at 1139 Sonterra Blvd., San Antonio, TX, 78258, in Bexar County.

Who is the owner or developer of Patient Tower and Ancillary Services Expansion?

Methodist Hospital Stone Oak is the property owner/developer of record for Patient Tower and Ancillary Services Expansion, per its TDLR project registration.

Who is the architect or design firm for Patient Tower and Ancillary Services Expansion?

Earl Swensson Associates, Inc. is the design firm of record for Patient Tower and Ancillary Services Expansion, according to its TDLR filing.

How much does Patient Tower and Ancillary Services Expansion cost and how big is it?

Patient Tower and Ancillary Services Expansion has an estimated construction value of $65.5M and approximately 83,785 square feet (about $782/sqft), based on its TDLR filing.

Scope of Work

Horizontal and Vertical Expansion to provide additional ancillary services square footage, new M/S patient unit and new ICU unit. The project will provide 73,707sf of new construction and 10,078 sf of renovation.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1139 Sonterra Blvd., San Antonio, TX, 78258

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

1139 E SONTERRA BLVD, City of San Antonio, TX 78258

2513 - New Security Gates

IssuedElectrical General PermitOct 2026
SAT-MEP-ELE-PMT26-33329657
1139 E SONTERRA BLVD, City of San Antonio, TX 78258

Building No: N/A; Unit No: N/A

IssuedExistingExistingOct 2026
SAT-COM-RML-PMT26-40000612
1139 E SONTERRA BLVD, City of San Antonio, TX 78258

Building No: 1139; Unit No: 240

IssuedPlumbing Irrigation PermitNewSep 2026
SAT-COM-IFO-PMT26-40500119
1139 E SONTERRA BLVD, City of San Antonio, TX 78258

EXPRESS - Site Work - New Detention Pond

IssuedComm Sitework PermitNewSep 2026
$11K
SAT-COM-SIT-PMT26-40100362
1139 E SONTERRA BLVD, City of San Antonio, TX 78258

METHODIST STONE OAK SUITE 535

IssuedElectrical General PermitJun 2026
SAT-MEP-ELE-PMT26-33316523

Watch all construction in 78258 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.