18th Street Utility Improvements in Waco, TX

18th Street from Waco Dr to Bosque Blvd, Waco, TX, 76701

Construction complete · Mar 2025Project Closed

18th Street Utility Improvements is a renovation/alteration project at 18th Street from Waco Dr to Bosque Blvd, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $530K across about 7,356 sq ft.

Estimated project value
$530K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,356 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$72/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 14, 2024383 days across supplied datesApr 1, 2025

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    355 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About 18th Street Utility Improvements

The 18th Street Utility Improvements project in Waco is complete, with the TDLR having closed the project file in March 2025. This renovation and alteration effort focused on utility, roadway, and pedestrian infrastructure along a specific corridor in McLennan County. The work involved installing pedestrian ramps and improving sidewalks to enhance accessibility for residents and visitors in the area.

Project Scope and Location

The construction took place on 18th Street from Waco Dr to Bosque Blvd, situated in the Heart of Texas neighborhood. The City of Waco Public Works served as the owner of record for this public works initiative. KPA Engineers was the design firm of record, overseeing the technical aspects of the renovation. The total estimated cost for the project was $530,142, covering the 7,356 sq ft of affected area. This translates to a cost of $72 per square foot for the completed work.

Timeline and Regulatory Status

Construction began in March 2024, and the scheduled completion date was April 2025. The project was registered with TDLR in March 2025, marking the formal end of the accessibility review process. Steven E Rinehart served as the registered accessibility specialist for the filing. Because the project involved public funds and land, it fell under specific regulatory oversight to ensure compliance with state standards for accessibility improvements.

Context and Comparisons

This project's estimated cost is above the county median for renovation and alteration filings in McLennan County, which stands at $279,286. The scheduled build window of 383 days is longer than the county median of 122 days for similar projects. However, the cost per square foot of $72 is below the county median of $96. KPA Engineers has been involved in six other TDLR-registered projects in the region, totaling over $20 million in value, indicating their significant role in local infrastructure development.

The site is located within a FEMA Special Flood Hazard Area, specifically zone AE, which may influence future maintenance and utility planning for the area. Nearby businesses include Harbor Freight, Magic Wash N Dry, and B Z's Boot & Shoe Repair, all of which benefit from the improved pedestrian access. The project contributes to the overall infrastructure quality in ZIP code 76701, where the median household income is estimated at $24,593 by the U.S. Census.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76701 (Waco)

One email per change. Unsubscribe in one click. Privacy.

18th Street Utility Improvements is a Renovation/Alteration project located at 18th Street from Waco Dr to Bosque Blvd in Waco, Texas. The project has an estimated value of $530K covering 7,356 sq ft. City of Waco - Public Works is the property owner and KPA Engineers is the design firm of record. The project was registered with TDLR on March 4, 2025.

Frequently Asked Questions

Is the 18th Street project finished?

Yes, the TDLR closed the project file in March 2025, indicating the accessibility review process is complete. Construction started in March 2024 and was scheduled for completion in April 2025.

Who designed the 18th Street improvements?

KPA Engineers served as the design firm of record for this project. They were responsible for the technical planning of the utility and pedestrian renovations.

What was the cost of the 18th Street work?

The estimated cost was $530,142. This covers the 7,356 sq ft of area involved in the renovation and alteration of utilities and sidewalks.

Where exactly is the 18th Street project?

The project is located on 18th Street from Waco Dr to Bosque Blvd in Waco, within the Heart of Texas neighborhood in McLennan County.

Is the business open?

The TDLR record confirms the construction and accessibility review are complete, but it does not provide information about the operational status of nearby businesses.

What is 18th Street Utility Improvements?

18th Street Utility Improvements is a renovation/alteration project at 18th Street from Waco Dr to Bosque Blvd in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Utility, Roadway, and Pedestrian Improvements - Pedestrian Ramps and Sidewalk Improvements

Is 18th Street Utility Improvements open in Waco?

Construction on 18th Street Utility Improvements is complete — TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.

Where is 18th Street Utility Improvements located?

18th Street Utility Improvements is located at 18th Street from Waco Dr to Bosque Blvd, Waco, TX, 76701, in McLennan County.

Who is the owner or developer of 18th Street Utility Improvements?

City of Waco - Public Works is the property owner/developer of record for 18th Street Utility Improvements, per its TDLR project registration.

Who is the architect or design firm for 18th Street Utility Improvements?

KPA Engineers is the design firm of record for 18th Street Utility Improvements, according to its TDLR filing.

How much does 18th Street Utility Improvements cost and how big is it?

18th Street Utility Improvements has an estimated construction value of $530K and approximately 7,356 square feet (about $72/sqft), based on its TDLR filing.

Scope of Work

Utility, Roadway, and Pedestrian Improvements - Pedestrian Ramps and Sidewalk Improvements

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

18th Street from Waco Dr to Bosque Blvd, Waco, TX, 76701

Loading location map…
31.54258, -97.17428

Watch all construction in 76701 (Waco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.