Project intelligenceTDLR TABS2025013386Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation

101 E Ave F, Jarrell, TX, 76537

Construction complete · Oct 2026Inspection Complete

Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation is a renovation/alteration project at 101 E Ave F, Jarrell, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $4.6M across about 12,860 sq ft.

Estimated project value
$4.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
12,860 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$358/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 5, 2025577 days across supplied datesOct 3, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    43 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    240 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    294 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation

Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation at 101 E Ave F in Jarrell, Texas, has passed its final TDLR accessibility inspection in October 2026, confirming that construction is complete. This renovation and alteration effort added 12,860 square feet of space to the existing facility, a scale that exceeds the median size of similar renovation projects in Williamson County, which stands at 3,000 square feet.

Jarrell ISD serves as the owner and developer of record for this $4,600,000 project. The estimated cost of $358 per square foot is above the county median of $95 per square foot for renovation and alteration filings. The project was registered with TDLR in March 2025, and plan review was completed within the same month, setting a scheduled build window of 240 days that is longer than the county median of 92 days.

Design and Funding

Huckabee is the design firm of record, bringing experience from other school district projects across Texas. The project involves public funds and public land, aligning with the district's broader capital improvement efforts. Ross A Thomas is the registered accessibility specialist listed in the filing.

Jarrell ISD has six other TDLR-registered projects totaling $268,703,779, including significant additions to Jarrell High School. Huckabee has also been the design firm for six other projects totaling $88,150,000, such as the Gatesville ISD Junior High Expansion. The presence of multiple large-scale district projects indicates a sustained investment in educational infrastructure within the area.

According to a post by the JarrellISD account, the district celebrated the grand opening of Paw Prints, describing it as the district's new Child Development Center. The district's website previously stated that construction was on track to be completed by May 2026, with the facility scheduled to open for the 2026–27 school year. The TDLR record confirms the physical completion of the construction work through the final inspection.

The project is situated in a community with a population of about 12,526 and a median household income of $96,067, according to U.S. Census ACS 2023 estimates. The Williamson County unemployment rate was 4.2 percent in June 2026, higher than a year earlier. Nearby businesses include Rodriguez Mexican Kitchen, Affordable Tire, Inc, and the Jarrell ISD Library, placing the center within an established residential and commercial corridor.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76537 (Jarrell)

One email per change. Unsubscribe in one click. Privacy.

Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation is a Renovation/Alteration project located at 101 E Ave F, Jarrell, TX 76537 in Jarrell, Texas. The project has an estimated value of $4.6M covering 12,860 sq ft. Jarrell ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on March 5, 2025.

Frequently Asked Questions

Is the Paw Prints Early Childhood Center open?

The TDLR record shows the construction is complete with a final inspection passed in October 2026. A Facebook post by JarrellISD reported the grand opening of the facility.

Who designed the Paw Prints addition?

Huckabee is the design firm of record for the Paw Prints Early Childhood Center Addition and Renovation project in Jarrell.

How much did the renovation cost?

The estimated cost for the 12,860 square foot renovation and addition was $4,600,000, which is above the county median for similar projects.

When did construction finish?

The building passed its final TDLR accessibility inspection in October 2026, marking the completion of the construction phase.

What is Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation?

Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation is a renovation/alteration project at 101 E Ave F in Jarrell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Paw Prints Early Childhood Center Addition and Renovation

Is Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation open in Jarrell?

Construction on Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation located?

Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation is located at 101 E Ave F, Jarrell, TX, 76537, in Williamson County.

Who is the owner or developer of Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation?

Jarrell ISD is the property owner/developer of record for Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation, per its TDLR project registration.

Who is the architect or design firm for Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation?

Huckabee is the design firm of record for Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation, according to its TDLR filing.

How much does Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation cost and how big is it?

Jarrell ISD | Paw Prints Early Childhood Center Addition and Renovation has an estimated construction value of $4.6M and approximately 12,860 square feet (about $358/sqft), based on its TDLR filing.

Scope of Work

Paw Prints Early Childhood Center Addition and Renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

101 E Ave F, Jarrell, TX, 76537

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

1012 SPEER LN

Replace sewer line in front yard

ActivePlumbing PermitRepairNov 2026
View Details
2026-145621 PP
Spot-On Plumbing LLC
1011 LOTT AVE

BASE: Installing a backup battery system and additional meter socket.

ActiveElectrical PermitAuxiliary PowerNov 2026
View Details
2026-141333 EP
Base Power
1011 BRICKELL LOOP

irrigation install

ActivePlumbing PermitIrrigationNov 2026
View Details
2026-143348 PP
1015 BRICKELL LOOP

irrigation install

ActivePlumbing PermitIrrigationNov 2026
View Details
2026-143344 PP
1013 BRICKELL LOOP

irrigation install

ActivePlumbing PermitIrrigationNov 2026
View Details
2026-143347 PP

Watch all construction in 76537 (Jarrell)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.