Project intelligenceTDLR TABS2025013689Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SW Alsbury Boulevard - Phase 2 Improvements

SW Alsbury Blvd., Burleson, TX, 76028

Opening ~Dec 2026Review Complete

SW Alsbury Boulevard - Phase 2 Improvements is a renovation/alteration project at SW Alsbury Blvd., Burleson, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $350K across about 30,000 sq ft.

Estimated project value
$350K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
30,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$12/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 8, 2025633 days across supplied datesDec 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    146 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    487 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SW Alsbury Boulevard - Phase 2 Improvements

The City of Burleson is undertaking a $350,000 renovation of SW Alsbury Boulevard, a project registered with TDLR in March 2025. This phase covers the stretch from CR 1020 to CR 920, focusing on pavement, drainage, and utility improvements. The work is scheduled to finish in December 2026, with construction starting in August 2025. This registration confirms the city’s commitment to upgrading this specific corridor within Tarrant County.

Freese and Nichols, Inc. serves as the design firm of record for this initiative. The scope includes 30,000 square feet of pedestrian improvements, specifically the installation of sidewalks, curb ramps, and crosswalk markings. These enhancements aim to improve accessibility and safety for residents and visitors navigating the area. The project involves public funds and is classified as a Federally funded roadway project under state regulations.

Project Scope and Cost Context

At an estimated cost of $350,000, this project exceeds the median cost for renovation and alteration filings in Tarrant County, which stands at $250,000. The scheduled build window of 487 days is longer than the county median of 92 days for similar projects. However, the cost per square foot is $12, which is below the county median of $79 per square foot. This disparity reflects the linear nature of roadway improvements compared to building-based renovations.

George A Patterson is the registered accessibility specialist associated with this filing. TDLR completed the plan review in March 2025, marking the project as Review Complete. The city has six other TDLR-registered projects totaling $39,961,100, indicating a broader pattern of infrastructure investment in Burleson. Freese and Nichols, Inc. has designed six other registered projects totaling $40,088,190, demonstrating their significant role in regional construction projects.

Third-party listings on platforms like ConstructConnect describe this as site work and paving for a mixed-use development in Burleson. These external references align with the TDLR record, confirming the project's location and scope. The area profile for ZIP 76028 shows a population of about 78,699 and a median household income of $100,125, suggesting a stable community benefiting from these infrastructure upgrades.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76028 (Burleson)

One email per change. Unsubscribe in one click. Privacy.

SW Alsbury Boulevard - Phase 2 Improvements is a Renovation/Alteration project located at SW Alsbury Blvd., Burleson, TX 76028 in Burleson, Texas. The project has an estimated value of $350K covering 30,000 sq ft. City of Burleson is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on March 8, 2025.

Frequently Asked Questions

When is the SW Alsbury Boulevard Phase 2 project scheduled to finish?

Construction is scheduled to finish in December 2026, with work starting in August 2025. TDLR completed the plan review in March 2025, and the project status is Review Complete.

Who is the design firm for this Burleson road project?

Freese and Nichols, Inc. is the design firm of record. They are also associated with six other TDLR-registered projects in Texas, including major roadway and trail improvements in Austin and Hutto.

What specific improvements are included in the 30,000 square feet of work?

The scope includes paving, drainage, utility, and pavement marking improvements. It also involves the installation of sidewalks, curb ramps, and crosswalk markings to enhance pedestrian accessibility along the corridor.

Is this project a new construction or a renovation?

The project is classified as a Renovation/Alteration. It involves improvements to the existing SW Alsbury Boulevard roadway and right-of-way, rather than building new structures from the ground up.

How does the cost compare to other Tarrant County projects?

The $350,000 estimated cost is above the county median of $250,000 for similar filings. However, the cost per square foot is $12, which is below the county median of $79 per square foot.

What is SW Alsbury Boulevard - Phase 2 Improvements?

SW Alsbury Boulevard - Phase 2 Improvements is a renovation/alteration project at SW Alsbury Blvd. in Burleson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Paving, drainage, utility, pavement marking improvements for SW Alsbury Boulevard - CR1020 to CR 920. Installation of sidewalk, curb ramp, and crosswalk markings. 30,000 SF of pedestrian improvements.

Is SW Alsbury Boulevard - Phase 2 Improvements open in Burleson?

SW Alsbury Boulevard - Phase 2 Improvements is still under construction in Burleson, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is SW Alsbury Boulevard - Phase 2 Improvements located?

SW Alsbury Boulevard - Phase 2 Improvements is located at SW Alsbury Blvd., Burleson, TX, 76028, in Tarrant County.

Who is the owner or developer of SW Alsbury Boulevard - Phase 2 Improvements?

City of Burleson is the property owner/developer of record for SW Alsbury Boulevard - Phase 2 Improvements, per its TDLR project registration.

Who is the architect or design firm for SW Alsbury Boulevard - Phase 2 Improvements?

Freese and Nichols, Inc. is the design firm of record for SW Alsbury Boulevard - Phase 2 Improvements, according to its TDLR filing.

How much does SW Alsbury Boulevard - Phase 2 Improvements cost and how big is it?

SW Alsbury Boulevard - Phase 2 Improvements has an estimated construction value of $350K and approximately 30,000 square feet (about $12/sqft), based on its TDLR filing.

Scope of Work

Paving, drainage, utility, pavement marking improvements for SW Alsbury Boulevard - CR1020 to CR 920. Installation of sidewalk, curb ramp, and crosswalk markings. 30,000 SF of pedestrian improvements.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

SW Alsbury Blvd., Burleson, TX, 76028

Location by street address

Watch all construction in 76028 (Burleson)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Burleson?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.