Spec Suite 390
Spec Suite 390 is a renovation/alteration project at 3120 Sabre Drive Suite 390, Southlake, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $102K across about 3,206 sq ft.
๐Project Metrics
TDLR #TABS2025014727Project Closed
Project has been completed and closed
Spec Suite 390 is a Renovation/Alteration project located at 3120 Sabre Drive Suite 390, Southlake, TX 76092 in Southlake, Texas. The project has an estimated value of $102K covering 3,206 sq ft. BDP SOUTHLAKE DST is the property owner and Schwabauer Design is the design firm of record. The project was registered with TDLR on March 20, 2025.
โFrequently Asked Questions
What is Spec Suite 390?
Spec Suite 390 is a renovation/alteration project at 3120 Sabre Drive Suite 390 in Southlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office renovation
Is Spec Suite 390 open in Southlake?
Construction on Spec Suite 390 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.
Where is Spec Suite 390 located?
Spec Suite 390 is located at 3120 Sabre Drive Suite 390, Southlake, TX, 76092, in Tarrant County.
Who is the owner or developer of Spec Suite 390?
BDP SOUTHLAKE DST is the property owner/developer of record for Spec Suite 390, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 390?
Schwabauer Design is the design firm of record for Spec Suite 390, according to its TDLR filing.
How much does Spec Suite 390 cost and how big is it?
Spec Suite 390 has an estimated construction value of $102K and approximately 3,206 square feet (about $32/sqft), based on its TDLR filing.
๐Scope of Work
Interior office renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 20, 2025
Review Complete
Inspection Complete
Closed
Mar 20, 2025