Project intelligenceTDLR TABS2025014936Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Hill Country Church Phase 2 in Fredericksburg, TX

107 East Lower Crabapple, Fredericksburg, TX, 78624

Opening ~Mar 2027Review Complete

Hill Country Church Phase 2 is a renovation/alteration project at 107 East Lower Crabapple, Fredericksburg, in Gillespie County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $2.0M across about 11,200 sq ft.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
11,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$179/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 24, 2025737 days across supplied datesMar 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    133 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    604 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Hill Country Church Phase 2

Hill Country Church is undertaking a $2,000,000 renovation and alteration project at 107 East Lower Crabapple in Fredericksburg, Gillespie County. The filing, registered with the Texas Department of Licensing and Regulation (TDLR), describes the work as the new construction of wood stud exterior and interior walls and an elevator shaft within existing CMU block walls. The project covers 11,200 square feet of space.

Project Scope and Design

Mustard Architects serves as the design firm of record for this phase of the church's development. The scope focuses on structural modifications and accessibility improvements, specifically the integration of an elevator shaft into the existing masonry structure. This work is part of a larger effort, as the owner has another TDLR-registered project in Fredericksburg that has already closed.

The estimated cost of $2,000,000 places this project in the top quarter of renovation and alteration filings in Gillespie County. The county median estimated cost for similar work is $300,000, with the middle half ranging from $144,375 to $803,000. At 11,200 square feet, the project size is also significantly larger than the county median of 3,000 square feet for this type of work.

Timeline and Financials

TDLR completed plan review in March 2025, and construction is scheduled to finish in March 2027, with work starting August 2025. This scheduled build window of 604 days is longer than the county median of 182 days for comparable projects. The estimated cost per square foot is $179, which is above the county median of $100 per square foot.

The project is privately funded and located on private land for private use. Laura Fulkerson is the registered accessibility specialist associated with the filing. The TDLR status is listed as Review Complete, indicating the plan review phase is finished.

Fredericksburg is a community with a population of about 23,610, according to U.S. Census estimates for the ZIP code. The median household income in the area is $67,987, and the median owner-occupied home value is $439,600. The Gillespie County unemployment rate was 3.6 percent in August 2026, according to the Federal Reserve Bank of St. Louis.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78624 (Fredericksburg)

One email per change. Unsubscribe in one click. Privacy.

Hill Country Church Phase 2 is a Renovation/Alteration project located at 107 East Lower Crabapple in Fredericksburg, Texas. The project has an estimated value of $2.0M covering 11,200 sq ft. Hill Country Church is the property owner and Mustard Architects is the design firm of record. The project was registered with TDLR on March 24, 2025.

Frequently Asked Questions

What is the current status of the Hill Country Church renovation?

TDLR completed plan review in March 2025. Construction is scheduled to start in August 2025 and is scheduled to finish in March 2027.

Who is the design firm for this project?

Mustard Architects is the design firm of record for the Hill Country Church Phase 2 renovation in Fredericksburg.

How much does the project cost per square foot?

The estimated cost is $2,000,000 for 11,200 square feet, resulting in a cost of $179 per square foot.

Is the church open to the public during construction?

The TDLR record only covers construction status. It does not provide information about public access or business hours during the renovation period.

What specific work is included in the scope?

The scope includes new construction of wood stud exterior and interior walls, as well as an elevator shaft within existing CMU block walls.

What is Hill Country Church Phase 2?

Hill Country Church Phase 2 is a renovation/alteration project at 107 East Lower Crabapple in Fredericksburg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of wood stud exterior and interior walls, elevator shaft within existing CMU block walls.

Is Hill Country Church Phase 2 open in Fredericksburg?

Hill Country Church Phase 2 is still under construction in Fredericksburg, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is Hill Country Church Phase 2 located?

Hill Country Church Phase 2 is located at 107 East Lower Crabapple, Fredericksburg, TX, 78624, in Gillespie County.

Who is the owner or developer of Hill Country Church Phase 2?

Hill Country Church is the property owner/developer of record for Hill Country Church Phase 2, per its TDLR project registration.

Who is the architect or design firm for Hill Country Church Phase 2?

Mustard Architects is the design firm of record for Hill Country Church Phase 2, according to its TDLR filing.

How much does Hill Country Church Phase 2 cost and how big is it?

Hill Country Church Phase 2 has an estimated construction value of $2.0M and approximately 11,200 square feet (about $179/sqft), based on its TDLR filing.

Scope of Work

New construction of wood stud exterior and interior walls, elevator shaft within existing CMU block walls.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

107 East Lower Crabapple, Fredericksburg, TX, 78624

Loading location map…
30.28760, -98.85811

Watch all construction in 78624 (Fredericksburg)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fredericksburg?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.