Project intelligenceTDLR TABS2025014948New Construction
Funding type

This project is privately funded, on private land for private use.

UCD Frisco BS&W MOB

525 University Drive, Frisco, TX, 75033

Construction complete · Oct 2026Project Closed

UCD Frisco BS&W MOB is a new construction project at 525 University Drive, Frisco, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $4.6M across about 12,500 sq ft.

Estimated project value
$4.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
12,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$372/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 24, 2025568 days across supplied datesOct 13, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    244 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    304 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About UCD Frisco BS&W MOB

UCD Frisco BS&W MOB is a 12,500-square-foot medical facility located at 525 University Drive in Frisco, Texas. The project involved the ground-up shell building and interior finish-out for a medical clinic, a scope that required significant structural and systems work. The construction was completed in December 2025, with the final inspection passed at that time.

Project Scope and Design

The development was owned by 4 Corners Medical, LP, a Texas Limited Partnership. Corgan served as the design firm of record, providing the architectural and engineering plans for this new construction. The estimated cost for the project was $4,648,806. This figure represents a cost of $372 per square foot, which is above the county median of $121 per square foot for similar new construction filings in Denton County.

This privately funded project was situated on private land for private use. The registration with the Texas Department of Licensing and Regulation (TDLR) occurred in March 2025. Plan review was completed in the same month, allowing construction to begin immediately. The scheduled build window was 244 days, a duration close to the county median of 219 days for comparable projects.

Status and Regional Context

Following the successful final inspection in December 2025, the regulatory process concluded. TDLR closed the project file in October 2026, which marks the end of the accessibility review process for this construction. The project is now considered complete under the accessibility registration system.

Friscos ZIP code 75033 serves a population of approximately 50,292 residents, according to U.S. Census Bureau estimates. The area has a median household income of $171,640 and a median owner-occupied home value of $606,500. Nearby businesses include general contractors and supply stores, reflecting the active development in the region. The Denton County unemployment rate stood at 4.2 percent in August 2026, indicating a stable labor market during the project's lifecycle.

Corgan has been involved in other significant projects in the state, including Crescent Tower in Fort Worth and various developments in Dallas. The UCD Frisco BS&W MOB stands as a completed example of high-end medical infrastructure in the North Texas corridor. The record confirms that all required accessibility reviews were satisfied before the file was closed.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75033 (Frisco)

One email per change. Unsubscribe in one click. Privacy.

UCD Frisco BS&W MOB is a New Construction project located at 525 University Drive, Frisco, TX 75033 in Frisco, Texas. The project has an estimated value of $4.6M covering 12,500 sq ft. 4 Corners Medical, LP, a Texas Limited Partnership is the property owner and Corgan is the design firm of record. The project was registered with TDLR on March 24, 2025.

Frequently Asked Questions

Is the UCD Frisco BS&W MOB open for business?

The TDLR record confirms construction was completed and the final inspection passed in December 2025. The project file was closed in October 2026, indicating the construction phase is finished, but the record does not specify operational opening dates.

Who designed the UCD Frisco BS&W MOB building?

Corgan is the design firm of record for this project. They provided the architectural and engineering plans for the 12,500-square-foot medical clinic in Frisco.

What was the estimated cost of this medical facility?

The estimated cost for the UCD Frisco BS&W MOB was $4,648,806. This amount covers the ground-up shell building and the medical clinic finish-out work.

When did the construction of this project end?

Construction start was recorded in March 2025. The final inspection was passed in December 2025, marking the physical completion of the building work.

Is this project located in Denton County?

Yes, the project is located in Frisco, which is in Denton County, Texas. The address is 525 University Drive.

What is UCD Frisco BS&W MOB?

UCD Frisco BS&W MOB is a new construction project at 525 University Drive in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Ground up shell building with Medical Clinic finish out.

Is UCD Frisco BS&W MOB open in Frisco?

Construction on UCD Frisco BS&W MOB is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is UCD Frisco BS&W MOB located?

UCD Frisco BS&W MOB is located at 525 University Drive, Frisco, TX, 75033, in Denton County.

Who is the owner or developer of UCD Frisco BS&W MOB?

4 Corners Medical, LP, a Texas Limited Partnership is the property owner/developer of record for UCD Frisco BS&W MOB, per its TDLR project registration.

Who is the architect or design firm for UCD Frisco BS&W MOB?

Corgan is the design firm of record for UCD Frisco BS&W MOB, according to its TDLR filing.

How much does UCD Frisco BS&W MOB cost and how big is it?

UCD Frisco BS&W MOB has an estimated construction value of $4.6M and approximately 12,500 square feet (about $372/sqft), based on its TDLR filing.

Scope of Work

Ground up shell building with Medical Clinic finish out.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

525 University Drive, Frisco, TX, 75033

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75033 (Frisco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.