Swim Center Reno
Swim Center Reno is a renovation/alteration project at 2305 Pool Rd., Grapevine, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $3.1M across about 20,000 sq ft.
๐Project Metrics
TDLR #TABS2025015046Project Closed
Project has been completed and closed
Swim Center Reno is a Renovation/Alteration project located at 2305 Pool Rd., Grapevine, TX 76051 in Grapevine, Texas. The project has an estimated value of $3.1M covering 20,000 sq ft. Grapevine ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on March 25, 2025.
โFrequently Asked Questions
What is Swim Center Reno?
Swim Center Reno is a renovation/alteration project at 2305 Pool Rd. in Grapevine, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation
Is Swim Center Reno open in Grapevine?
Construction on Swim Center Reno is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.
Where is Swim Center Reno located?
Swim Center Reno is located at 2305 Pool Rd., Grapevine, TX, 76051, in Tarrant County.
Who is the owner or developer of Swim Center Reno?
Grapevine ISD is the property owner/developer of record for Swim Center Reno, per its TDLR project registration.
Who is the architect or design firm for Swim Center Reno?
Huckabee is the design firm of record for Swim Center Reno, according to its TDLR filing.
How much does Swim Center Reno cost and how big is it?
Swim Center Reno has an estimated construction value of $3.1M and approximately 20,000 square feet (about $155/sqft), based on its TDLR filing.
๐Scope of Work
Renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 25, 2025
Review Complete
Inspection Complete
Closed
Mar 25, 2025