Hospital Renovation and Expansion Package 2 - Site Improvements in Pearsall, TX

200 S IH-35, Pearsall, TX, 78061

Construction complete · Sep 2026Project Closed

Hospital Renovation and Expansion Package 2 - Site Improvements is a renovation/alteration project at 200 S IH-35, Pearsall, in Frio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $1.7M across about 45,000 sq ft.

Estimated project value
$1.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
45,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$38/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 27, 2025551 days across supplied datesSep 29, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    190 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    265 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Hospital Renovation and Expansion Package 2 - Site Improvements

Frio Regional Hospital completed a $1,700,000 renovation and expansion project at 200 S IH-35 in Pearsall, Texas. The work, registered with TDLR in March 2025, focused on site improvements including expanded parking, a new drive, and relocated accessory buildings. The project spanned 45,000 square feet of site modifications, with construction beginning in May 2025 and concluding in January 2026.

The scope of work involved significant logistical adjustments to accommodate ongoing hospital operations. This included installing temporary walkways for a relocated ambulance drop-off area and positioning a temporary MRI trailer. These measures ensured that critical patient care services remained accessible while the permanent site infrastructure was rebuilt and expanded.

Design and Construction Details

O' Connell Robertson served as the design firm of record for this project. The estimated cost of $1,700,000 for 45,000 square feet results in a computed cost of $38 per square foot. This figure is below the county median of $149 per square foot for similar renovation and alteration filings in Frio County. The scheduled build window of 61 days was shorter than the county median of 110 days, reflecting an efficient execution timeline.

The project was privately funded on private land for private use. Peter F Grojean was the registered accessibility specialist overseeing the compliance aspects of the construction. TDLR closed the project file in September 2026, which marks the end of the accessibility review process for this construction. This closure confirms that the final inspection passed in January 2026 and all regulatory requirements were met.

Frio Regional Hospital is located in Pearsall, a community in Frio County with a population of approximately 9,968 according to U.S. Census estimates. The hospital is one of several registered projects in the area, including other additions and new construction nearby. The renovation supports the facility's capacity to serve the local population, with a median household income in the ZIP code of $47,567.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78061 (Pearsall)

One email per change. Unsubscribe in one click. Privacy.

Hospital Renovation and Expansion Package 2 - Site Improvements is a Renovation/Alteration project located at 200 S IH-35, Pearsall, TX 78061 in Pearsall, Texas. The project has an estimated value of $1.7M covering 45,000 sq ft. FRIO REGIONAL HOSPITAL is the property owner and O' Connell Robertson is the design firm of record. The project was registered with TDLR on March 27, 2025.

Frequently Asked Questions

Is the hospital open?

The construction project is closed. The TDLR record indicates the project file was closed in September 2026 after the final inspection passed in January 2026. The record does not state the current operational status of the hospital itself.

What was the cost per square foot?

The estimated cost was $1,700,000 for 45,000 square feet, resulting in a computed cost of $38 per square foot. This is below the Frio County median of $149 per square foot for similar renovation projects.

Who designed the project?

O' Connell Robertson was the design firm of record. Peter F Grojean served as the registered accessibility specialist for the project.

When did construction finish?

Construction started in May 2025. The final inspection passed in January 2026, and TDLR closed the project file in September 2026.

What is Hospital Renovation and Expansion Package 2 - Site Improvements?

Hospital Renovation and Expansion Package 2 - Site Improvements is a renovation/alteration project at 200 S IH-35 in Pearsall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The work consists of site improvements (expanded parking and drive), relocated accessory buildings, temporary walkways for relocated ambulance drop-off and a MRI trailer.

Is Hospital Renovation and Expansion Package 2 - Site Improvements open in Pearsall?

Construction on Hospital Renovation and Expansion Package 2 - Site Improvements is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is Hospital Renovation and Expansion Package 2 - Site Improvements located?

Hospital Renovation and Expansion Package 2 - Site Improvements is located at 200 S IH-35, Pearsall, TX, 78061, in Frio County.

Who is the owner or developer of Hospital Renovation and Expansion Package 2 - Site Improvements?

FRIO REGIONAL HOSPITAL is the property owner/developer of record for Hospital Renovation and Expansion Package 2 - Site Improvements, per its TDLR project registration.

Who is the architect or design firm for Hospital Renovation and Expansion Package 2 - Site Improvements?

O' Connell Robertson is the design firm of record for Hospital Renovation and Expansion Package 2 - Site Improvements, according to its TDLR filing.

How much does Hospital Renovation and Expansion Package 2 - Site Improvements cost and how big is it?

Hospital Renovation and Expansion Package 2 - Site Improvements has an estimated construction value of $1.7M and approximately 45,000 square feet (about $38/sqft), based on its TDLR filing.

Scope of Work

The work consists of site improvements (expanded parking and drive), relocated accessory buildings, temporary walkways for relocated ambulance drop-off and a MRI trailer.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

200 S IH-35, Pearsall, TX, 78061

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78061 (Pearsall)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pearsall?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.