Phase 2A Water Treatment Plant Expansion in Cedar Creek, TX
1906 Hur Industrial Blvd, Cedar Creek, TX, 78613
Phase 2A Water Treatment Plant Expansion is a new construction project at 1906 Hur Industrial Blvd, Cedar Creek, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2028. The project has an estimated value of $50.0M across about 15,276 sq ft.
- Estimated project value
- $50.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 15,276 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $3.27K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 8mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
157 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
970 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Phase 2A Water Treatment Plant Expansion
The Brushy Creek Regional Utility Authority (BCRUA) is constructing a new two-story water treatment plant at 1906 Hur Industrial Blvd in Cedar Creek, Texas. This facility, named Treatment Structure South in the project records, covers 15,276 square feet and is scheduled to finish in April 2028. The structure includes a process gallery on the ground floor, a mezzanine for storage and equipment, and office spaces on the second floor.
Project Scope and Cost
Valued at an estimated $50,000,000, this new construction project represents a significant infrastructure investment in Travis County. The cost per square foot is calculated at $3,273, which places the project above the county median for similar new construction filings. Construction work is slated to begin in September 2025, following the completion of plan review in March 2025.
Freese and Nichols serves as the design firm of record for the project. The registered accessibility specialist is Marcela Abadi Rhoads. The project involves public funds and public land, ensuring it meets specific regulatory standards for public infrastructure.
Local Context and Timeline
The scheduled build window of 970 days is longer than the median build window of 304 days for new construction projects in Travis County. This extended timeline reflects the complexity of building a specialized water treatment facility rather than a standard commercial building. The project is registered with TDLR, with the status marked as Review Complete .
Located in the Hur Industrial area, the new plant joins other recent construction activities in the vicinity, including warehouse buildings and renovations at nearby commercial sites. The Cedar Creek area, part of the broader Austin metro region, has seen various development projects, but this water treatment expansion is distinct in its public utility function and scale.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78613 (Cedar Creek)
One email per change. Unsubscribe in one click. Privacy.
Phase 2A Water Treatment Plant Expansion is a New Construction project located at 1906 Hur Industrial Blvd, Cedar Creek, TX 78613 in Cedar Creek, Texas. The project has an estimated value of $50.0M covering 15,276 sq ft. Brushy Creek Regional Utility Authority (BCRUA) is the property owner and Freese and Nichols is the design firm of record. The project was registered with TDLR on March 28, 2025.
Frequently Asked Questions
When will the water treatment plant be finished?
Construction is scheduled to finish in April 2028. Work is planned to start in September 2025, with plan review completed in March 2025.
Who is building the Treatment Structure South?
The owner is the Brushy Creek Regional Utility Authority (BCRUA). Freese and Nichols is the design firm of record for the project.
How large is the new water treatment facility?
The building is 15,276 square feet. It features a process gallery, a mezzanine for equipment, and office spaces across two stories.
What is the estimated cost of the project?
The estimated cost is $50,000,000. This results in a cost per square foot of $3,273, which is above the Travis County median for new construction.
Is the facility currently open?
No, the facility is under construction. The TDLR record indicates construction is scheduled to finish in April 2028, so it is not yet operational.
What is Phase 2A Water Treatment Plant Expansion?
Phase 2A Water Treatment Plant Expansion is a new construction project at 1906 Hur Industrial Blvd in Cedar Creek, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new two-story water treatment plant building, including a process gallery on the ground floor, a mezzanine for storage and equipment, and office spaces on the second floor.The total area is 15,276 square feet.
Is Phase 2A Water Treatment Plant Expansion open in Cedar Creek?
Phase 2A Water Treatment Plant Expansion is still under construction in Cedar Creek, TX, with an estimated completion of Apr 2028 according to its TDLR registration.
Where is Phase 2A Water Treatment Plant Expansion located?
Phase 2A Water Treatment Plant Expansion is located at 1906 Hur Industrial Blvd, Cedar Creek, TX, 78613, in Travis County.
Who is the owner or developer of Phase 2A Water Treatment Plant Expansion?
Brushy Creek Regional Utility Authority (BCRUA) is the property owner/developer of record for Phase 2A Water Treatment Plant Expansion, per its TDLR project registration.
Who is the architect or design firm for Phase 2A Water Treatment Plant Expansion?
Freese and Nichols is the design firm of record for Phase 2A Water Treatment Plant Expansion, according to its TDLR filing.
How much does Phase 2A Water Treatment Plant Expansion cost and how big is it?
Phase 2A Water Treatment Plant Expansion has an estimated construction value of $50.0M and approximately 15,276 square feet (about $3.27K/sqft), based on its TDLR filing.
Scope of Work
Construction of a new two-story water treatment plant building, including a process gallery on the ground floor, a mezzanine for storage and equipment, and office spaces on the second floor.The total area is 15,276 square feet.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1906 Hur Industrial Blvd, Cedar Creek, TX, 78613
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Related City Permits
Building permits found at or near this location
BASE: Installing a backup battery system and additional meter socket.
ETJ - Installation of 9.6kw PV Solar system.
Replacing subpanel due to fire damage by vandalism.
Replacement of complete existing central heat and air system with or without duct work Bill Kennedy
BASE: Installing a backup battery system and additional meter socket.
Watch all construction in 78613 (Cedar Creek)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Cedar Creek?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.