Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
IH 35 NEX Phase 2 (CSJ: 0017-10-292) in San Antonio, TX
From: N. Walters St. To: IH 410 S., San Antonio, TX, 78219
IH 35 NEX Phase 2 (CSJ: 0017-10-292) is a new construction project at From: N. Walters St. To: IH 410 S., San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2029. The project has an estimated value of $1.5M across about 88,420 sq ft.
- Estimated project value
- $1.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 88,420 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $17/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
92 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,561 days after the preceding date shown.
Source: TDLR filing
View source record
📰About IH 35 NEX Phase 2 (CSJ: 0017-10-292)
The project filed as Csj: 0017-10-292 is the IH 35 NEX Phase 2 in San Antonio. This new construction effort widens Interstate 35 from six to ten lanes between N. Walters St. and IH 410 S. Construction is scheduled to finish in October 2029, with work starting in July 2025.
Owned by TxDOT District: San Antonio, the project carries an estimated cost of $1,538,600. The scope covers 88,420 sq ft of roadway and infrastructure. It includes replacing the bridges over UPRR and the Frost Bank Center Dr bridge. It also adds two elevated bridge structures with two lanes in each direction north of Frost Bank Center Dr to Petroleum Dr. Sidewalk and ADA ramp reconstruction are part of the plan.
Project Status and Registration
The project was registered with TDLR in March 2025. Plan review was completed in the same month, and the TDLR status is listed as Review Complete. The registered accessibility specialist for this filing is Frank Fonseca. The design firm of record is Kimley-Horn & Associates, Inc.
This project involves public funds and is a Federally funded roadway project. For context, the median estimated cost for new construction filings in Bexar County is $600,000. This project's cost is above that median. However, its cost per square foot of $17 is below the county median of $115. The scheduled build window of 1,561 days is longer than the county median of 207 days.
TxDOT District: San Antonio has six other TDLR-registered projects totaling $31,802,622. These include various roadway and facility projects in San Antonio, La Vernia, and New Braunfels. All six are marked as review complete. The area around the project site, ZIP 78219, has a population of about 16,946 according to U.S. Census ACS 2023 estimates. The median household income in this area is $52,147.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78219 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
IH 35 NEX Phase 2 (CSJ: 0017-10-292) is a New Construction project located at From: N. Walters St. To: IH 410 S., San Antonio, TX 78219 in San Antonio, Texas. The project has an estimated value of $1.5M covering 88,420 sq ft. TxDOT District: San Antonio is the property owner and Kimley-Horn & Associates, Inc. is the design firm of record. The project was registered with TDLR on March 31, 2025.
Frequently Asked Questions
When is the IH 35 NEX Phase 2 project scheduled to finish?
Construction is scheduled to finish in October 2029. Work is set to begin in July 2025, following the completion of plan review in March 2025.
What is the estimated cost of this roadway widening project?
The estimated cost for the IH 35 NEX Phase 2 project is $1,538,600. This figure covers the widening of the highway and associated bridge and sidewalk work.
Who is the owner and design firm for this project?
The owner of record is TxDOT District: San Antonio. The design firm of record is Kimley-Horn & Associates, Inc.
What specific changes are included in the scope of work?
The scope includes widening IH 35 from 6 to 10 lanes, replacing bridges over UPRR and Frost Bank Center Dr, and adding two elevated bridge structures.
Is this project funded by public money?
Yes, this project involves public funds and is a Federally funded roadway project. It is located on public land in San Antonio.
What is IH 35 NEX Phase 2 (CSJ: 0017-10-292)?
IH 35 NEX Phase 2 (CSJ: 0017-10-292) is a new construction project at From: N. Walters St. To: IH 410 S. in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widen IH 35 from 6 to 10 lanes. Replace the bridges over UPRR, Frost Bank Center Dr bridge, add 2 elevated bridge structures with 2 lanes in each direction N of Frost Bank Center Dr to Petroleum Dr. Include sidewalk and ADA ramp reconstr…
Is IH 35 NEX Phase 2 (CSJ: 0017-10-292) open in San Antonio?
IH 35 NEX Phase 2 (CSJ: 0017-10-292) is still under construction in San Antonio, TX, with an estimated completion of Oct 2029 according to its TDLR registration.
Where is IH 35 NEX Phase 2 (CSJ: 0017-10-292) located?
IH 35 NEX Phase 2 (CSJ: 0017-10-292) is located at From: N. Walters St. To: IH 410 S., San Antonio, TX, 78219, in Bexar County.
Who is the owner or developer of IH 35 NEX Phase 2 (CSJ: 0017-10-292)?
TxDOT District: San Antonio is the property owner/developer of record for IH 35 NEX Phase 2 (CSJ: 0017-10-292), per its TDLR project registration.
Who is the architect or design firm for IH 35 NEX Phase 2 (CSJ: 0017-10-292)?
Kimley-Horn & Associates, Inc. is the design firm of record for IH 35 NEX Phase 2 (CSJ: 0017-10-292), according to its TDLR filing.
How much does IH 35 NEX Phase 2 (CSJ: 0017-10-292) cost and how big is it?
IH 35 NEX Phase 2 (CSJ: 0017-10-292) has an estimated construction value of $1.5M and approximately 88,420 square feet (about $17/sqft), based on its TDLR filing.
Scope of Work
Widen IH 35 from 6 to 10 lanes. Replace the bridges over UPRR, Frost Bank Center Dr bridge, add 2 elevated bridge structures with 2 lanes in each direction N of Frost Bank Center Dr to Petroleum Dr. Include sidewalk and ADA ramp reconstruction.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: N. Walters St. To: IH 410 S., San Antonio, TX, 78219
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$31.88B totalWatch all construction in 78219 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.