Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Marlin ISD High School Gym Addition
1400 Capps Street, Marlin, TX, 76661
Marlin ISD High School Gym Addition is a additions to existing building project at 1400 Capps Street, Marlin, in Falls County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $5.9M across about 13,800 sq ft.
- Estimated project value
- $5.9M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 13,800 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $428/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
29 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76661 (Marlin)
One email per change. Unsubscribe in one click. Privacy.
Marlin ISD High School Gym Addition is a Additions to Existing Building project located at 1400 Capps Street in Marlin, Texas. The project has an estimated value of $5.9M covering 13,800 sq ft. Marlin ISD is the property owner and MRB group is the design firm of record. The project was registered with TDLR on April 1, 2025.
Frequently Asked Questions
What is Marlin ISD High School Gym Addition?
Marlin ISD High School Gym Addition is a additions to existing building project at 1400 Capps Street in Marlin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 13800 SF PEMB addition to match the existing building to include gymnasium area with spectator seating and entry vestibule.
Is Marlin ISD High School Gym Addition open in Marlin?
Marlin ISD High School Gym Addition was scheduled to finish construction in Apr 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Marlin ISD High School Gym Addition located?
Marlin ISD High School Gym Addition is located at 1400 Capps Street, Marlin, TX, 76661, in Falls County.
Who is the owner or developer of Marlin ISD High School Gym Addition?
Marlin ISD is the property owner/developer of record for Marlin ISD High School Gym Addition, per its TDLR project registration.
Who is the architect or design firm for Marlin ISD High School Gym Addition?
MRB group is the design firm of record for Marlin ISD High School Gym Addition, according to its TDLR filing.
How much does Marlin ISD High School Gym Addition cost and how big is it?
Marlin ISD High School Gym Addition has an estimated construction value of $5.9M and approximately 13,800 square feet (about $428/sqft), based on its TDLR filing.
Scope of Work
13800 SF PEMB addition to match the existing building to include gymnasium area with spectator seating and entry vestibule.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1400 Capps Street, Marlin, TX, 76661
Related Projects
Same Owner
$22.7M totalNearby Projects
Within 1 kmWatch all construction in 76661 (Marlin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Marlin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.