MCD23098.0
MCD23098.0 is a renovation/alteration project at 4220 98th St., Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $120K across about 2,000 sq ft.
📊Project Metrics
TDLR #TABS2025015738Project Registered
Project has been registered with TDLR and is in pre-construction phase
MCD23098.0 is a Renovation/Alteration project located at 4220 98th St., Lubbock, TX 79423 in Lubbock, Texas. The project has an estimated value of $120K covering 2,000 sq ft. McDonald’s Real Estate Company is the property owner and PM Design Group Inc is the design firm of record. The project was registered with TDLR on April 2, 2025.
❓Frequently Asked Questions
What is MCD23098.0?
MCD23098.0 is a renovation/alteration project at 4220 98th St. in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel
Is MCD23098.0 open in Lubbock?
MCD23098.0 is currently under construction in Lubbock, TX. Its current TDLR status is "Project Registered".
Where is MCD23098.0 located?
MCD23098.0 is located at 4220 98th St., Lubbock, TX, 79423, in Lubbock County.
Who is the owner or developer of MCD23098.0?
McDonald’s Real Estate Company is the property owner/developer of record for MCD23098.0, per its TDLR project registration.
Who is the architect or design firm for MCD23098.0?
PM Design Group Inc is the design firm of record for MCD23098.0, according to its TDLR filing.
How much does MCD23098.0 cost and how big is it?
MCD23098.0 has an estimated construction value of $120K and approximately 2,000 square feet (about $60/sqft), based on its TDLR filing.
📋Scope of Work
Interior remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📅Project Timeline
Filed
Apr 2, 2025
Review Complete
Inspection Complete
Closed