PNC Bank ADA Remediation Design
PNC Bank ADA Remediation Design is a renovation/alteration project at 521 N 77 Sunshine Strip, Harlingen, in Cameron County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $325K across about 18,163 sq ft.
๐Project Metrics
TDLR #TABS2025015767Project Closed
Project has been completed and closed
PNC Bank ADA Remediation Design is a Renovation/Alteration project located at 521 N 77 Sunshine Strip, Harlingen, TX 78550 in Harlingen, Texas. The project has an estimated value of $325K covering 18,163 sq ft. PNC Bank, N.A is the property owner and Michael Baker International is the design firm of record. The project was registered with TDLR on April 3, 2025.
โFrequently Asked Questions
What is PNC Bank ADA Remediation Design?
PNC Bank ADA Remediation Design is a renovation/alteration project at 521 N 77 Sunshine Strip in Harlingen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Exterior replaces sidewalk, pavement & new ada parking, eliminates parking for a new drive-up ATM; milling / paving the remaining site. 18,163 SF. Interior converts a portion of break room to a service room for the new ATM 31 SF.
Is PNC Bank ADA Remediation Design open in Harlingen?
Construction on PNC Bank ADA Remediation Design is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is PNC Bank ADA Remediation Design located?
PNC Bank ADA Remediation Design is located at 521 N 77 Sunshine Strip, Harlingen, TX, 78550, in Cameron County.
Who is the owner or developer of PNC Bank ADA Remediation Design?
PNC Bank, N.A is the property owner/developer of record for PNC Bank ADA Remediation Design, per its TDLR project registration.
Who is the architect or design firm for PNC Bank ADA Remediation Design?
Michael Baker International is the design firm of record for PNC Bank ADA Remediation Design, according to its TDLR filing.
How much does PNC Bank ADA Remediation Design cost and how big is it?
PNC Bank ADA Remediation Design has an estimated construction value of $325K and approximately 18,163 square feet (about $18/sqft), based on its TDLR filing.
๐Scope of Work
Exterior replaces sidewalk, pavement & new ada parking, eliminates parking for a new drive-up ATM; milling / paving the remaining site. 18,163 SF. Interior converts a portion of break room to a service room for the new ATM 31 SF.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 3, 2025
Review Complete
Apr 3, 2025
Inspection Complete
Dec 10, 2025
Closed
Jan 28, 2026
251d
Construction phase