Catholic Outreach Services - Cooler Addition in San Angelo, TX

410 North Chadbourne St, San Angelo, TX, 76903

Construction complete · May 2026Inspection Complete

Catholic Outreach Services - Cooler Addition is a additions to existing building project at 410 North Chadbourne St, San Angelo, in Tom Green County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $60K across about 92 sq ft.

Estimated project value
$60K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
92 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$652/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 3, 2025411 days across supplied datesMay 19, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    153 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    230 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Catholic Outreach Services - Cooler Addition

Catholic Outreach Services completed a 92 square foot cooler addition at 410 North Chadbourne St in San Angelo. The project, filed with the Texas Department of Licensing and Regulatory Affairs (TDLR) as Catholic Outreach Services - Cooler Addition, is officially finished. The structure passed its final TDLR accessibility inspection in May 2026, confirming that all construction work is complete and the building meets state accessibility standards.

The scope involved adding a stand-alone walk-in cooler to the rear of the existing building. Construction included pouring a new concrete foundation and cutting a new door opening in the main structure to provide direct entry into the cooler. This addition was designed to expand the facility's storage capabilities without altering the primary footprint of the existing space.

Project Details and Cost

The estimated cost for this addition was $60,000. This figure places the project below the median estimated cost for similar additions in Tom Green County, which stands at $475,000. The scheduled build window was 153 days, a duration close to the county median of 183 days for comparable work. The project was privately funded on private land for private use by the owner of record, Diocese of San Angelo (DOSA, LLC).

SKG Engineering, LLC served as the design firm of record. The registered accessibility specialist for the project was Susan D Gregonis. Plan review was completed in April 2025, and construction began in May 2025. The filing listed an October 2025 completion date, but the final inspection did not occur until May 2026.

SKG Engineering has been involved in several other TDLR-registered projects in the San Angelo area. These include work for The Bank and Trust, SSB, San Angelo Central High Portable Classrooms, and Field and Streams. The firm’s portfolio in the region totals over $3 million in registered project values. This cooler addition represents a smaller-scale intervention within a broader pattern of construction activity in Tom Green County.

The site is located in a commercial area of San Angelo with a median household income of $49,045 according to U.S. Census estimates for ZIP code 76903. The neighborhood includes various businesses such as Hartman Roofing and Window Depot USA. The completion of this project adds to the local inventory of commercial infrastructure in the city.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76903 (San Angelo)

One email per change. Unsubscribe in one click. Privacy.

Catholic Outreach Services - Cooler Addition is a Additions to Existing Building project located at 410 North Chadbourne St, San Angelo, TX 76903 in San Angelo, Texas. The project has an estimated value of $60K covering 92 sq ft. Diocese of San Angelo (DOSA,LLC) is the property owner and SKG Engineering, LLC is the design firm of record. The project was registered with TDLR on April 3, 2025.

Frequently Asked Questions

Is the Catholic Outreach Services cooler addition finished?

Yes, the project passed its final TDLR accessibility inspection in May 2026. Construction is complete, and the 92 square foot cooler addition is fully built and inspected.

Who designed the cooler addition?

SKG Engineering, LLC was the design firm of record for the project. Susan D Gregonis served as the registered accessibility specialist.

What is the address of the project?

The project is located at 410 North Chadbourne St, San Angelo, TX 76903, in Tom Green County.

How much did the addition cost?

The estimated cost for the 92 square foot cooler addition was $60,000. This is below the county median for similar additions.

When was the final inspection completed?

The final TDLR accessibility inspection was completed in May 2026. This confirms the construction status as complete according to state records.

What is Catholic Outreach Services - Cooler Addition?

Catholic Outreach Services - Cooler Addition is a additions to existing building project at 410 North Chadbourne St in San Angelo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: addition of a 92 sq ft stand-alone walk in cooler to the rear of the building. There will be a concrete foundation below the cooler and a new door opening will be cut in the building for entry into the new cooler

Is Catholic Outreach Services - Cooler Addition open in San Angelo?

Construction on Catholic Outreach Services - Cooler Addition is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.

Where is Catholic Outreach Services - Cooler Addition located?

Catholic Outreach Services - Cooler Addition is located at 410 North Chadbourne St, San Angelo, TX, 76903, in Tom Green County.

Who is the owner or developer of Catholic Outreach Services - Cooler Addition?

Diocese of San Angelo (DOSA,LLC) is the property owner/developer of record for Catholic Outreach Services - Cooler Addition, per its TDLR project registration.

Who is the architect or design firm for Catholic Outreach Services - Cooler Addition?

SKG Engineering, LLC is the design firm of record for Catholic Outreach Services - Cooler Addition, according to its TDLR filing.

How much does Catholic Outreach Services - Cooler Addition cost and how big is it?

Catholic Outreach Services - Cooler Addition has an estimated construction value of $60K and approximately 92 square feet (about $652/sqft), based on its TDLR filing.

Scope of Work

addition of a 92 sq ft stand-alone walk in cooler to the rear of the building. There will be a concrete foundation below the cooler and a new door opening will be cut in the building for entry into the new cooler

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

410 North Chadbourne St, San Angelo, TX, 76903

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76903 (San Angelo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Angelo?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.