Midland College Daniel Hall Renovation

3600 N Garfield St, Midland, TX, 79705

Target date passed (Sep 2026)Review Complete

Midland College Daniel Hall Renovation is a renovation/alteration project at 3600 N Garfield St, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $7.0M across about 28,760 sq ft.

Estimated project value
$7.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
28,760 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$243/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 8, 2025521 days across supplied datesSep 11, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    279 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    242 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Midland College Daniel Hall Renovation

The Midland College Daniel Hall Renovation is a $7,000,000 project to alter an existing 28,760 sq ft student housing building at 3600 N Garfield St in Midland. This renovation is part of a broader campus investment by Midland College, which has six other TDLR-registered projects totaling $45,885,000 in the area.

The scope of work involves the comprehensive renovation of the structure to meet updated accessibility standards. The project is registered with the Texas Department of Licensing and Regulation (TDLR) under the Accessibility (TABS) program. Plan review for this filing was completed in April 2025, establishing the regulatory baseline for the upcoming construction phase.

Project Scale and Cost

At an estimated cost of $7,000,000, the project represents a significant financial commitment for the 28,760 sq ft facility. The computed cost of $243 per square foot is above the county median of $81 for similar renovation filings in Midland County. This places the project in the top quarter of estimated costs among 1,060 registered renovation and alteration projects in the region.

The scheduled build window is 242 days, which is longer than the county median of 122 days for comparable work. DLR Group serves as the design firm of record, bringing experience from other major projects such as the Keystone Complex in Georgetown and Building 2 in Bee Cave. The registered accessibility specialist for this filing is Peter Walper.

Construction is scheduled to begin in January 2026, with a planned completion date of September 2026. Although the scheduled end date has passed, the TDLR record has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record. The project status remains Review Complete, indicating that the permitting phase is finished but final occupancy or completion certification is pending.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79705 (Midland)

One email per change. Unsubscribe in one click. Privacy.

Midland College Daniel Hall Renovation is a Renovation/Alteration project located at 3600 N Garfield St in Midland, Texas. The project has an estimated value of $7.0M covering 28,760 sq ft. Midland College is the property owner and DLR Group is the design firm of record. The project was registered with TDLR on April 8, 2025.

Frequently Asked Questions

What is the current status of Daniel Hall renovation?

The TDLR record shows the project status as Review Complete. The scheduled completion date of September 2026 has passed, but the record has not yet recorded a final inspection, so the site status is unconfirmed.

Who is the owner and design firm for this project?

Midland College is the owner of record. DLR Group is the design firm of record for the 28,760 sq ft renovation at 3600 N Garfield St in Midland.

How much does the Daniel Hall renovation cost?

The estimated cost is $7,000,000. This equates to $243 per square foot, which is above the Midland County median of $81 for similar renovation filings.

When is construction scheduled to start and finish?

Construction is scheduled to start in January 2026. The filing lists a completion date of September 2026, though no final inspection has been recorded in the TDLR database.

Is Daniel Hall open to the public?

The TDLR record only tracks construction and accessibility permits. It has not yet recorded a final inspection, so there is no public confirmation that the facility is open or operational.

What is Midland College Daniel Hall Renovation?

Midland College Daniel Hall Renovation is a renovation/alteration project at 3600 N Garfield St in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of an existing 28,760 sf student housing building.

Is Midland College Daniel Hall Renovation open in Midland?

Midland College Daniel Hall Renovation was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Midland College Daniel Hall Renovation located?

Midland College Daniel Hall Renovation is located at 3600 N Garfield St, Midland, TX, 79705, in Midland County.

Who is the owner or developer of Midland College Daniel Hall Renovation?

Midland College is the property owner/developer of record for Midland College Daniel Hall Renovation, per its TDLR project registration.

Who is the architect or design firm for Midland College Daniel Hall Renovation?

DLR Group is the design firm of record for Midland College Daniel Hall Renovation, according to its TDLR filing.

How much does Midland College Daniel Hall Renovation cost and how big is it?

Midland College Daniel Hall Renovation has an estimated construction value of $7.0M and approximately 28,760 square feet (about $243/sqft), based on its TDLR filing.

Scope of Work

Renovation of an existing 28,760 sf student housing building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3600 N Garfield St, Midland, TX, 79705

32.03143, -102.11075

Watch all construction in 79705 (Midland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.