Project intelligenceTDLR TABS2025016420Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

2024 Capital Improvements For Sanford-Fritch ISD - Elementary

201 S Hoyne, Fritch, TX, 79036

Construction complete · Aug 2026Project Closed

2024 Capital Improvements For Sanford-Fritch ISD - Elementary is a renovation/alteration project at 201 S Hoyne, Fritch, in Hutchinson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $1.2M across about 22,986 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
22,986 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$52/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 10, 2025483 days across supplied datesAug 6, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    67 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    246 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    135 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79036 (Fritch)

One email per change. Unsubscribe in one click. Privacy.

2024 Capital Improvements For Sanford-Fritch ISD - Elementary is a Renovation/Alteration project located at 201 S Hoyne, Fritch, TX 79036 in Fritch, Texas. The project has an estimated value of $1.2M covering 22,986 sq ft. Sanford-Fritch ISD is the property owner and Shiver Megert & Associates is the design firm of record. The project was registered with TDLR on April 10, 2025.

Frequently Asked Questions

What is 2024 Capital Improvements For Sanford-Fritch ISD - Elementary?

2024 Capital Improvements For Sanford-Fritch ISD - Elementary is a renovation/alteration project at 201 S Hoyne in Fritch, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing areas at Elementary School

Is 2024 Capital Improvements For Sanford-Fritch ISD - Elementary open in Fritch?

Construction on 2024 Capital Improvements For Sanford-Fritch ISD - Elementary is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is 2024 Capital Improvements For Sanford-Fritch ISD - Elementary located?

2024 Capital Improvements For Sanford-Fritch ISD - Elementary is located at 201 S Hoyne, Fritch, TX, 79036, in Hutchinson County.

Who is the owner or developer of 2024 Capital Improvements For Sanford-Fritch ISD - Elementary?

Sanford-Fritch ISD is the property owner/developer of record for 2024 Capital Improvements For Sanford-Fritch ISD - Elementary, per its TDLR project registration.

Who is the architect or design firm for 2024 Capital Improvements For Sanford-Fritch ISD - Elementary?

Shiver Megert & Associates is the design firm of record for 2024 Capital Improvements For Sanford-Fritch ISD - Elementary, according to its TDLR filing.

How much does 2024 Capital Improvements For Sanford-Fritch ISD - Elementary cost and how big is it?

2024 Capital Improvements For Sanford-Fritch ISD - Elementary has an estimated construction value of $1.2M and approximately 22,986 square feet (about $52/sqft), based on its TDLR filing.

Scope of Work

Renovation of existing areas at Elementary School

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 79036 (Fritch)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Hutchinson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists