Final inspection completed, awaiting project closure
Jacintoport Make Ready is a Renovation/Alteration project located at 14950 Jacintoport Blvd #100, Houston, TX 77015 in Houston, Texas. The project has an estimated value of $539K covering 353,375 sq ft. Johnson Development Associates is the property owner and LO Architecture is the design firm of record. The project was registered with TDLR on April 11, 2025.
Jacintoport Make Ready is a renovation/alteration project at 14950 Jacintoport Blvd #100, Houston, TX 77015 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: PROJECT IS 353,375 SF TOTAL WITH 4,003 SF OF INTERIOR BUILD-OUT IN AN EXISTING SHELL BUILDING. THERE IS NO EXTERIOR WORK. ALL BUILDINGS , PARKING, AND SITE WORK ARE EXISTING. PROJECT IS A SPEC OFFICE - NO TENANT AT THIS TIME.
Construction on Jacintoport Make Ready is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.
Jacintoport Make Ready is located at 14950 Jacintoport Blvd #100, Houston, TX 77015, Houston, TX, 77015, in Harris County.
Johnson Development Associates is the property owner/developer of record for Jacintoport Make Ready, per its TDLR project registration.
LO Architecture is the design firm of record for Jacintoport Make Ready, according to its TDLR filing.
Jacintoport Make Ready has an estimated construction value of $539K and approximately 353,375 square feet (about $2/sqft), based on its TDLR filing.
PROJECT IS 353,375 SF TOTAL WITH 4,003 SF OF INTERIOR BUILD-OUT IN AN EXISTING SHELL BUILDING. THERE IS NO EXTERIOR WORK. ALL BUILDINGS , PARKING, AND SITE WORK ARE EXISTING. PROJECT IS A SPEC OFFICE - NO TENANT AT THIS TIME.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 11, 2025
Review Complete
Apr 11, 2025
Inspection Complete
Apr 8, 2026
Closed
362d
Construction phase