Cox Intermediate School

3515 Waterbend CV, Spring, TX, 77386

Target date passed (Jul 2026)Review Complete

Cox Intermediate School is a renovation/alteration project at 3515 Waterbend CV, Spring, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $5.0M across about 108,000 sq ft.

Estimated project value
$5.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
108,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$46/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 14, 2025473 days across supplied datesJul 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    424 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77386 (Spring)

One email per change. Unsubscribe in one click. Privacy.

Cox Intermediate School is a Renovation/Alteration project located at 3515 Waterbend CV in Spring, Texas. The project has an estimated value of $5.0M covering 108,000 sq ft. Conroe ISD is the property owner and HKS is the design firm of record. The project was registered with TDLR on April 14, 2025.

Frequently Asked Questions

What is Cox Intermediate School?

Cox Intermediate School is a renovation/alteration project at 3515 Waterbend CV in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Maintenace to chillers, boilers, cooler/ freezer condensers, and safety/ security upgrades

Is Cox Intermediate School open in Spring?

Cox Intermediate School was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Cox Intermediate School located?

Cox Intermediate School is located at 3515 Waterbend CV, Spring, TX, 77386, in Montgomery County.

Who is the owner or developer of Cox Intermediate School?

Conroe ISD is the property owner/developer of record for Cox Intermediate School, per its TDLR project registration.

Who is the architect or design firm for Cox Intermediate School?

HKS is the design firm of record for Cox Intermediate School, according to its TDLR filing.

How much does Cox Intermediate School cost and how big is it?

Cox Intermediate School has an estimated construction value of $5.0M and approximately 108,000 square feet (about $46/sqft), based on its TDLR filing.

Scope of Work

Maintenace to chillers, boilers, cooler/ freezer condensers, and safety/ security upgrades

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3515 Waterbend CV, Spring, TX, 77386

30.10896, -95.37791

Watch all construction in 77386 (Spring)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.