Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
DOLLY VOGEL INTERMEDIATE SCHOOL in Spring, TX
27125 GEFFERT WRIGHT RD, Spring, TX, 77386
DOLLY VOGEL INTERMEDIATE SCHOOL is a renovation/alteration project at 27125 GEFFERT WRIGHT RD, Spring, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $5.0M across about 124,500 sq ft.
- Estimated project value
- $5.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 124,500 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $40/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
77 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
396 days after the preceding date shown.
Source: TDLR filing
View source record
📰About DOLLY VOGEL INTERMEDIATE SCHOOL
Dolly Vogel Intermediate School in Spring, Texas, is undergoing a $5,000,000 renovation and alteration project covering its 124,500 sq ft campus. Located at 27125 Geffert Wright Rd in Montgomery County, the work focuses on critical infrastructure and safety systems. The project is registered with TDLR under the TABS program, and the record shows that TDLR has not yet recorded a final inspection, meaning the current state of the site is not confirmed in the public record.
The scope of work includes the maintenance of chillers, boilers, and air handlers, along with roofing repairs. The filing also lists safety and security upgrades as part of the renovation. These mechanical and structural improvements are designed to support the continued operation of the school facility. The estimated cost of $5,000,000 places this project in the top quarter of renovation filings in Montgomery County, where the median estimated cost is $250,000.
Conroe ISD is the owner of record for this project. The district has six other TDLR-registered projects totaling $87,000,000, including Washington High School in Conroe and Bush Elementary School in The Woodlands. HKS is the design firm of record, a firm that has been involved in other large-scale projects such as the Boutique Hotel in San Antonio. William T Winning is the registered accessibility specialist for this filing.
Project Timeline and Status
TDLR completed plan review in April 2025, and the construction start date was scheduled for June 2025. The completion date listed on the filing is July 2026. Despite this scheduled end date, the TDLR status remains Review Complete, and the agency has not yet recorded a final inspection. This indicates that while the paperwork has been processed, the physical completion of the work has not been verified by the state.
The site is located in ZIP code 77386, a predominantly owner-occupied area with a median household income of $130,094 according to U.S. Census estimates. The scheduled build window of 396 days is longer than the county median of 92 days for similar renovation projects. The cost per square foot is $40, which is below the county median of $85 for comparable work.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77386 (Spring)
One email per change. Unsubscribe in one click. Privacy.
DOLLY VOGEL INTERMEDIATE SCHOOL is a Renovation/Alteration project located at 27125 GEFFERT WRIGHT RD in Spring, Texas. The project has an estimated value of $5.0M covering 124,500 sq ft. Conroe ISD is the property owner and HKS is the design firm of record. The project was registered with TDLR on April 14, 2025.
Frequently Asked Questions
What is the current status of Dolly Vogel Intermediate School renovation?
TDLR has not yet recorded a final inspection. The plan review was completed in April 2025, and construction was scheduled to finish in July 2026, but the public record does not confirm site completion.
Who is the owner of the Dolly Vogel Intermediate School project?
Conroe ISD is the owner of record. The design firm is HKS, and William T Winning is the registered accessibility specialist for the filing.
What work is being done at Dolly Vogel Intermediate School?
The scope includes maintenance of chillers, boilers, and air handlers, roofing work, and safety and security upgrades. The project is classified as a renovation and alteration.
Is the Dolly Vogel Intermediate School project finished?
No. Although the scheduled completion date was July 2026, TDLR has not yet recorded a final inspection, so the final state of the site is not confirmed in the public record.
How much does the Dolly Vogel Intermediate School renovation cost?
The estimated cost is $5,000,000. This is above the median estimated cost for renovation projects in Montgomery County, which is $250,000.
What is DOLLY VOGEL INTERMEDIATE SCHOOL?
DOLLY VOGEL INTERMEDIATE SCHOOL is a renovation/alteration project at 27125 GEFFERT WRIGHT RD in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: maintenance of chillers, boiler, air handler, roofing, safety and security upgrades
Is DOLLY VOGEL INTERMEDIATE SCHOOL open in Spring?
DOLLY VOGEL INTERMEDIATE SCHOOL was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is DOLLY VOGEL INTERMEDIATE SCHOOL located?
DOLLY VOGEL INTERMEDIATE SCHOOL is located at 27125 GEFFERT WRIGHT RD, Spring, TX, 77386, in Montgomery County.
Who is the owner or developer of DOLLY VOGEL INTERMEDIATE SCHOOL?
Conroe ISD is the property owner/developer of record for DOLLY VOGEL INTERMEDIATE SCHOOL, per its TDLR project registration.
Who is the architect or design firm for DOLLY VOGEL INTERMEDIATE SCHOOL?
HKS is the design firm of record for DOLLY VOGEL INTERMEDIATE SCHOOL, according to its TDLR filing.
How much does DOLLY VOGEL INTERMEDIATE SCHOOL cost and how big is it?
DOLLY VOGEL INTERMEDIATE SCHOOL has an estimated construction value of $5.0M and approximately 124,500 square feet (about $40/sqft), based on its TDLR filing.
Scope of Work
maintenance of chillers, boiler, air handler, roofing, safety and security upgrades
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
27125 GEFFERT WRIGHT RD, Spring, TX, 77386
Related Projects
Same Owner
$1.90B totalWatch all construction in 77386 (Spring)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Spring?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.