Funding type
This project is privately funded, on private land for private use.
Christ The King Church in Austin, TX
7006 Sir Gawain Drive, Austin, TX, 78745
Christ The King Church is a additions to existing building project at 7006 Sir Gawain Drive, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $950K across about 2,250 sq ft.
- Estimated project value
- $950K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,250 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $422/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
44 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
183 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
306 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Christ The King Church
Christ The King Church completed a 2,250 square foot expansion in the Hillside Oaks neighborhood of Austin. The project added a one-story wing to the existing 4,600 square foot church building and included interior renovations. The work passed its final TDLR accessibility inspection in October 2026, confirming the construction is complete.
The scope of work included the construction of new restrooms, a breakroom, a lobby, and a classroom. The filing specified a 1,244 square foot addition to the exterior structure and approximately 1,050 square feet of interior renovation within the existing building. The total estimated cost for this private project was $950,000.
NEWTON Architecture served as the design firm of record for the project. Attila Huszka was the registered accessibility specialist. The project was registered with TDLR in April 2025, with plan review completed in the same month. Construction began in June 2025, and the scheduled completion date was December 2025.
The site is located at 7006 Sir Gawain Drive in Travis County. City of Austin permit records show four permits issued at this address between September and November 2025. These included electrical, plumbing, mechanical, and building permits. The declared valuations on these permits total $950,000, matching the estimated project cost.
This project is one of several TDLR-registered additions in the area. Other nearby projects include renovations at Eberhart Place Apartments and Barton Ridge. The church previously registered a separate project in Houston with an estimated cost of $120,000, which is now closed. The local labor market in Travis County showed an unemployment rate of 3.9 percent in July 2026.
Project Context
The estimated cost of $950,000 is above the median for similar additions in Travis County, which is $448,278. The cost per square foot is $422, which is above the county median of $171. The scheduled build window of 183 days is close to the county median of 183 days. These figures are computed from 710 TDLR-registered filings in the county.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78745 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Christ The King Church is a Additions to Existing Building project located at 7006 Sir Gawain Drive, Austin, TX 78745 in Austin, Texas. The project has an estimated value of $950K covering 2,250 sq ft. Christ the King Presbyterian Church is the property owner and NEWTON Architecture is the design firm of record. The project was registered with TDLR on April 18, 2025.
Frequently Asked Questions
Is the Christ the King Church addition complete?
Yes, the building passed its final TDLR accessibility inspection in October 2026. The TDLR status is listed as Inspection Complete, indicating that construction and regulatory review are finished.
Who designed the Christ the King Church expansion?
NEWTON Architecture was the design firm of record. Attila Huszka served as the registered accessibility specialist for the project, which was registered with TDLR in April 2025.
What specific rooms were added to the church?
The project included new restrooms, a breakroom, a lobby, and a classroom. This involved a 1,244 square foot exterior addition and approximately 1,050 square feet of interior renovation.
Where is the Christ the King Church project located?
The project is located at 7006 Sir Gawain Drive in Austin, Texas. It is in the Hillside Oaks neighborhood of Travis County, outside the FEMA floodplain.
How does the project cost compare to local averages?
The $950,000 estimated cost is above the Travis County median of $448,278 for similar additions. The cost per square foot is also above the county median.
What is Christ The King Church?
Christ The King Church is a additions to existing building project at 7006 Sir Gawain Drive in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,244 GSF one-story addition to an existing 4,600 GSF one-story Church and approximately 1,050 square feet of interior renovation within the existing Church. Work includes new restrooms, breakroom, lobby, and classroom
Is Christ The King Church open in Austin?
Construction on Christ The King Church is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.
Where is Christ The King Church located?
Christ The King Church is located at 7006 Sir Gawain Drive, Austin, TX, 78745, in Travis County.
Who is the owner or developer of Christ The King Church?
Christ the King Presbyterian Church is the property owner/developer of record for Christ The King Church, per its TDLR project registration.
Who is the architect or design firm for Christ The King Church?
NEWTON Architecture is the design firm of record for Christ The King Church, according to its TDLR filing.
How much does Christ The King Church cost and how big is it?
Christ The King Church has an estimated construction value of $950K and approximately 2,250 square feet (about $422/sqft), based on its TDLR filing.
Scope of Work
1,244 GSF one-story addition to an existing 4,600 GSF one-story Church and approximately 1,050 square feet of interior renovation within the existing Church. Work includes new restrooms, breakroom, lobby, and classroom
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
7006 Sir Gawain Drive, Austin, TX, 78745
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$4.7M totalRelated City Permits
Building permits found at or near this location
EMERGENCY- Neutral behind the meter is burned-house is experiencing a voltage drop- upgrade service required.
New construction of SFR mobile home. The carports shown on the plans were removed from the scope of work at the applicants request. Addition of the carports will require a revision or a new separate permit application.
New construction of SFR mobile home. The carports shown on the plans were removed from the scope of work at the applicants request. Addition of the carports will require a revision or a new separate permit application. Rolling in 2025-019577 PP for scope of work: Replace wastewater yardline from clean out to city tap.
New construction of SFR mobile home. The carports shown on the plans were removed from the scope of work at the applicants request. Addition of the carports will require a revision or a new separate permit application.
EXPRESS: Refoof due to hail damage. Replacing underlayment shingles drip edge pipe jack flashing and gutters.
Watch all construction in 78745 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.