Project intelligenceTDLR TABS2025017303Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Barbers Hill Middle School South Additions & Renovations

9500 Eagle Drive, Mont Belvieu, TX, 77580

Construction complete · Aug 2026Inspection Complete

Barbers Hill Middle School South Additions & Renovations is a additions to existing building project at 9500 Eagle Drive, Mont Belvieu, in Chambers County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $18.5M across about 22,500 sq ft.

Estimated project value
$18.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
22,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$822/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 23, 2025495 days across supplied datesAug 31, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    8 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    462 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    25 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Barbers Hill Middle School South Additions & Renovations

The Barbers Hill Middle School South Additions & Renovations project at 9500 Eagle Drive in Mont Belvieu is complete. This $18,500,000 construction effort added 22,500 square feet to the existing school building, specifically creating a new cafeteria and large group instruction area. The work was registered with TDLR in April 2025, and the project passed its final TDLR accessibility inspection in August 2026, confirming the construction phase is finished.

Barbers Hill ISD serves as the owner of record for this project in Chambers County. The design firm of record is cre8 Architects, which has been involved in six other TDLR-registered projects totaling $1,797,009. The registered accessibility specialist for this filing is Attila Huszka. The project utilized public funds and public land, with plan review completed in April 2025 and construction starting in May 2025.

Project Scale and Cost Context

The estimated cost of $18,500,000 places this project in the top quarter of similar filings in Chambers County. The median estimated cost for additions to existing buildings in the county is $743,282, with a middle half ranging from $275,000 to $4,538,250. The size of 22,500 square feet is significantly larger than the county median of 5,809 square feet for this project type. The cost per square foot is $822, which is above the county median of $191 per square foot.

The scheduled build window for this project was 487 days, which is longer than the county median of 286 days for similar additions. This location in Mont Belvieu is part of a cluster of development in the area, including other registered projects such as the Eagle Pointe Recreation Center and new construction for a Chipotle Mexican Grill.

Barbers Hill ISD has one other TDLR-registered project, the Barbers Hill High School Baseball and Softball Fields, which has closed. The design firm, cre8 Architects, has also worked on projects in Sugar Land and Santa Fe, including additions to Colony Meadow Elementary School and Brazos Bend Elementary School. The completion of this project adds substantial instructional and dining capacity to the school facility.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77580 (Mont Belvieu)

One email per change. Unsubscribe in one click. Privacy.

Barbers Hill Middle School South Additions & Renovations is a Additions to Existing Building project located at 9500 Eagle Drive, Mont Belvieu, TX 77580 in Mont Belvieu, Texas. The project has an estimated value of $18.5M covering 22,500 sq ft. Barbers Hill ISD is the property owner and cre8 Architects is the design firm of record. The project was registered with TDLR on April 23, 2025.

Frequently Asked Questions

Is the Barbers Hill Middle School South addition finished?

Yes, the project passed its final TDLR accessibility inspection in August 2026. Construction is complete, and the building additions are ready for use by the school district.

What was added to the existing school building?

The project added a new cafeteria and a large group instruction area. The total addition is 22,500 square feet, expanding the facility's capacity for dining and teaching.

Who is the design firm for this project?

Cre8 Architects is the design firm of record. They have been involved in six other TDLR-registered projects, including work on other schools in the Barbers Hill ISD district.

How does the cost compare to other local projects?

The $18,500,000 cost is above the county median for similar additions. The median cost in Chambers County is $743,282, making this a significantly larger investment than typical local projects.

What is Barbers Hill Middle School South Additions & Renovations?

Barbers Hill Middle School South Additions & Renovations is a additions to existing building project at 9500 Eagle Drive in Mont Belvieu, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New cafeteria and large group instruction addition

Is Barbers Hill Middle School South Additions & Renovations open in Mont Belvieu?

Construction on Barbers Hill Middle School South Additions & Renovations is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is Barbers Hill Middle School South Additions & Renovations located?

Barbers Hill Middle School South Additions & Renovations is located at 9500 Eagle Drive, Mont Belvieu, TX, 77580, in Chambers County.

Who is the owner or developer of Barbers Hill Middle School South Additions & Renovations?

Barbers Hill ISD is the property owner/developer of record for Barbers Hill Middle School South Additions & Renovations, per its TDLR project registration.

Who is the architect or design firm for Barbers Hill Middle School South Additions & Renovations?

cre8 Architects is the design firm of record for Barbers Hill Middle School South Additions & Renovations, according to its TDLR filing.

How much does Barbers Hill Middle School South Additions & Renovations cost and how big is it?

Barbers Hill Middle School South Additions & Renovations has an estimated construction value of $18.5M and approximately 22,500 square feet (about $822/sqft), based on its TDLR filing.

Scope of Work

New cafeteria and large group instruction addition

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9500 Eagle Drive, Mont Belvieu, TX, 77580

Location by street address

Watch all construction in 77580 (Mont Belvieu)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mont Belvieu?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.