Funding type
This project is privately funded, on private land for private use.
Exxon MCO Level 2 in Midland, TX
3617 North Big Spring St, Midland TX 79705, Midland, TX, 79705
Exxon MCO Level 2 is a renovation/alteration project at 3617 North Big Spring St, Midland TX 79705, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $10.4M across about 39,000 sq ft.
- Estimated project value
- $10.4M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 39,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $267/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
6 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
38 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
182 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
91 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
158 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Exxon MCO Level 2
The ExxonMobil Midland Corporate Office renovation at 3617 North Big Spring St in Midland, Texas, is complete. This interior alteration project covered 39,000 square feet on Level 2 of the building, with an estimated cost of $10,400,000. The work was registered with the Texas Department of Licensing and Regulation (TDLR) in April 2025 and concluded with a final inspection passed in March 2026. In August 2026, TDLR closed the project file, marking the end of the accessibility review process for this construction.
Pioneer Natural Resources USA INC is the owner of record for this privately funded project on private land. The design firm of record is Corgan, a company with a broader portfolio of registered projects in Texas. The registered accessibility specialist for the filing was Richard Todd Lozano. The scope of work was specifically defined as the interior renovation of Level 2, a detail that distinguishes this alteration from full-building construction.
Project Scale and Cost Context
The estimated cost of $10,400,000 translates to $267 per square foot. This figure is above the county median of $80 per square foot for renovation and alteration filings in Midland County. The total cost is also above the county median of $250,000, placing the project in the top quarter of filings for its type. The scheduled build window of 182 days was longer than the county median of 122 days for similar projects.
Construction began in June 2025, following plan review completion in April 2025. The filing indicated a completion date of November 2025, but the final inspection was not passed until March 2026. This timeline reflects the actual duration of the work and the subsequent verification process required by state regulations. The project is now fully closed in the TDLR system, with no outstanding accessibility review items.
Midland County has a median household income of $105,106 according to U.S. Census estimates for ZIP 79705. The area is predominantly owner-occupied, with a median home value of $329,300. The unemployment rate in Midland County was 3.3 percent in August 2026, lower than a year earlier. These economic indicators provide context for the local market in which this corporate office renovation took place.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79705 (Midland)
One email per change. Unsubscribe in one click. Privacy.
Exxon MCO Level 2 is a Renovation/Alteration project located at 3617 North Big Spring St, Midland TX 79705, Midland, TX 79705 in Midland, Texas. The project has an estimated value of $10.4M covering 39,000 sq ft. PIONEER NATURAL RESOURCES USA INC is the property owner and Corgan is the design firm of record. The project was registered with TDLR on April 24, 2025.
Frequently Asked Questions
Is the ExxonMobil Midland Corporate Office open?
The TDLR record confirms the construction project is closed and the final inspection passed in March 2026. The record does not state whether the business is open to the public.
Who owns the building at 3617 North Big Spring St?
Pioneer Natural Resources USA INC is the owner of record for this privately funded project.
How much did the Level 2 renovation cost?
The estimated cost was $10,400,000 for 39,000 square feet of interior renovation.
When did the construction finish?
The final inspection passed in March 2026, and TDLR closed the project file in August 2026.
What is Exxon MCO Level 2?
Exxon MCO Level 2 is a renovation/alteration project at 3617 North Big Spring St, Midland TX 79705 in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of Level 2
Is Exxon MCO Level 2 open in Midland?
Construction on Exxon MCO Level 2 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.
Where is Exxon MCO Level 2 located?
Exxon MCO Level 2 is located at 3617 North Big Spring St, Midland TX 79705, Midland, TX, 79705, in Midland County.
Who is the owner or developer of Exxon MCO Level 2?
PIONEER NATURAL RESOURCES USA INC is the property owner/developer of record for Exxon MCO Level 2, per its TDLR project registration.
Who is the architect or design firm for Exxon MCO Level 2?
Corgan is the design firm of record for Exxon MCO Level 2, according to its TDLR filing.
How much does Exxon MCO Level 2 cost and how big is it?
Exxon MCO Level 2 has an estimated construction value of $10.4M and approximately 39,000 square feet (about $267/sqft), based on its TDLR filing.
Scope of Work
Interior renovation of Level 2
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3617 North Big Spring St, Midland TX 79705, Midland, TX, 79705
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$32.2M totalWatch all construction in 79705 (Midland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.