Project intelligenceTDLR TABS2025017389Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Rochelle ISD Elementary and Main Bldg. Reno

5902 Lafayette Ave, Rochelle, TX, 76872

Construction complete · Apr 2025Inspection Complete

Rochelle ISD Elementary and Main Bldg. Reno is a renovation/alteration project at 5902 Lafayette Ave, Rochelle, in McCulloch County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2025). The project has an estimated value of $650K across about 5,756 sq ft.

Estimated project value
$650K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,756 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$113/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 24, 202599 days across supplied datesAug 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    92 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76872 (Rochelle)

One email per change. Unsubscribe in one click. Privacy.

Rochelle ISD Elementary and Main Bldg. Reno is a Renovation/Alteration project located at 5902 Lafayette Ave in Rochelle, Texas. The project has an estimated value of $650K covering 5,756 sq ft. Rochelle Independent School District is the property owner and Makers Design Collaborative, LLC is the design firm of record. The project was registered with TDLR on April 24, 2025.

Frequently Asked Questions

What is Rochelle ISD Elementary and Main Bldg. Reno?

Rochelle ISD Elementary and Main Bldg. Reno is a renovation/alteration project at 5902 Lafayette Ave in Rochelle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to elementary school wing, restrooms, and HVAC system.

Is Rochelle ISD Elementary and Main Bldg. Reno open in Rochelle?

Construction on Rochelle ISD Elementary and Main Bldg. Reno is complete — TDLR records show the project passed its required accessibility inspection in Apr 2025. The building is finished and very likely open.

Where is Rochelle ISD Elementary and Main Bldg. Reno located?

Rochelle ISD Elementary and Main Bldg. Reno is located at 5902 Lafayette Ave, Rochelle, TX, 76872, in McCulloch County.

Who is the owner or developer of Rochelle ISD Elementary and Main Bldg. Reno?

Rochelle Independent School District is the property owner/developer of record for Rochelle ISD Elementary and Main Bldg. Reno, per its TDLR project registration.

Who is the architect or design firm for Rochelle ISD Elementary and Main Bldg. Reno?

Makers Design Collaborative, LLC is the design firm of record for Rochelle ISD Elementary and Main Bldg. Reno, according to its TDLR filing.

How much does Rochelle ISD Elementary and Main Bldg. Reno cost and how big is it?

Rochelle ISD Elementary and Main Bldg. Reno has an estimated construction value of $650K and approximately 5,756 square feet (about $113/sqft), based on its TDLR filing.

Scope of Work

Renovation to elementary school wing, restrooms, and HVAC system.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5902 Lafayette Ave, Rochelle, TX, 76872

31.22293, -99.20426

Watch all construction in 76872 (Rochelle)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Rochelle?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.