Lakeside Baptist Church is a renovation/alteration project at 500 W Bluebonet Dr., Granbury, in Hood County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $1.0M across about 10,192 sq ft.
Project has been completed and closed
Lakeside Baptist Church is a Renovation/Alteration project located at 500 W Bluebonet Dr., Granbury, TX 76048 in Granbury, Texas. The project has an estimated value of $1.0M covering 10,192 sq ft. Lakeside Baptist Church is the property owner and Urban Bobcat Architects is the design firm of record. The project was registered with TDLR on April 24, 2025.
Lakeside Baptist Church is a renovation/alteration project at 500 W Bluebonet Dr. in Granbury, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Existing childrens building interior remodel and addition of lobby space.
Construction on Lakeside Baptist Church is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Lakeside Baptist Church is located at 500 W Bluebonet Dr., Granbury, TX, 76048, in Hood County.
Lakeside Baptist Church is the property owner/developer of record for Lakeside Baptist Church, per its TDLR project registration.
Urban Bobcat Architects is the design firm of record for Lakeside Baptist Church, according to its TDLR filing.
Lakeside Baptist Church has an estimated construction value of $1.0M and approximately 10,192 square feet (about $98/sqft), based on its TDLR filing.
Existing childrens building interior remodel and addition of lobby space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 24, 2025
Review Complete
Apr 24, 2025
Inspection Complete
Jan 11, 2026
Closed
Mar 14, 2026
262d
Construction phase