Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD in Spring, TX
22505 Spring Stuebner Loop 1/2, Spring, TX, 77389
Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD is a new construction project at 22505 Spring Stuebner Loop 1/2, Spring, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2017 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.8M across about 5,700 sq ft.
- Estimated project value
- $1.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,700 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $314/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 9mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
625 days after the preceding date shown.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
2,969 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD
A 5,700 sq ft structure designated for electrical, blower, laboratory, and control systems is located at 22505 Spring Stuebner Loop 1/2 in Spring, Texas. The project is classified as new construction within Harris County. The owner of record is HCID No. 18, and the design firm is DCS Engineering, LLC. The estimated cost for this facility is $1,790,179. This equates to $314 per square foot. The scope includes housing electrical and mechanical equipment, a laboratory, and a restroom.
The filing identifies the broader effort as a Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD. This registration involves public funds, public land, or a Federally funded roadway project. The project was registered with TDLR in April 2025. The construction start date listed in the filing is June 2015. The completion date on the filing is March 2017. This date has passed. The TDLR status is listed as Project Registered. No plan review or inspection has been recorded since the registration, so whether it proceeded is not confirmed in the public record.
Cost and Size Context
The estimated cost of $1,790,179 is above the county median for new construction filings in Harris County. The median estimated cost for these filings is $750,000. The median size is 9,000 sq ft. This project is smaller than that median. The cost per square foot of $314 is above the county median of $88. The scheduled build window of 625 days is longer than the county median of 221 days. These figures are computed from 22161 TDLR-registered new construction filings in the county.
HCID No. 18 has two other TDLR-registered projects in Spring. These are City Place - Spring Grove Park Trail and Trails. Both projects are closed. DCS Engineering, LLC has two other registered projects. These are Buda Sportsplex in Buda and a project in Hearne. The Buda project has review complete. The Hearne project is closed. Both are distinct from the Spring facility described here.
The surrounding area includes businesses such as SRS Building Products and Turcios Tile. Spring Fire Department Station 78 is also nearby. The U.S. Census ACS 2023 five-year estimates for ZIP code 77389 show a population of about 44,545. The median household income is $145,228. There are 15,138 housing units. The median owner-occupied home value is $387,100. Housing in this area is predominantly owner-occupied. These are Census estimates for the ZIP code.
The Harris County unemployment rate was 5 percent in August 2026. This figure is lower than a year earlier. This labor market data provides context for the region. The specific construction status of the 5,700 sq ft building remains unconfirmed in the public record. The registration details provide the primary factual basis for this project description. The scope and cost are specific to this filing.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77389 (Spring)
One email per change. Unsubscribe in one click. Privacy.
Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD is a New Construction project located at 22505 Spring Stuebner Loop 1/2, Spring, TX 77389 in Spring, Texas. The project has an estimated value of $1.8M covering 5,700 sq ft. HCID No. 18 is the property owner and DCS Engineering, LLC is the design firm of record. The project was registered with TDLR on April 25, 2025.
Frequently Asked Questions
What is the status of the Electrical Lab Building in Spring?
The project is registered with TDLR . No plan review or inspection has been recorded. The public record does not confirm whether construction proceeded after the listed completion date of March 2017.
How much does the Spring wastewater expansion cost?
The estimated cost is $1,790,179. This figure is above the Harris County median for new construction. The cost per square foot is $314, which is also above the county median of $88.
Who is the owner of the Spring facility?
The owner of record is HCID No. 18. The design firm is DCS Engineering, LLC. The project involves public funds or land. The address is 22505 Spring Stuebner Loop 1/2.
Is the building open for business?
The record only covers construction registration. No plan review or inspection has been recorded. The public record does not confirm if the facility is open or operating. The status is Project Registered.
What is the square footage of the new construction?
The building is 5,700 sq ft. This is smaller than the 9,000 sq ft median for new construction in Harris County. The scope includes electrical equipment, a laboratory, and a restroom.
What is Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD?
Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD is a new construction project at 22505 Spring Stuebner Loop 1/2 in Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of building to house electrical and mechanical equipments, a laboratory and a restroom
Is Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD open in Spring?
Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD was scheduled to finish construction in Mar 2017 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD located?
Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD is located at 22505 Spring Stuebner Loop 1/2, Spring, TX, 77389, in Harris County.
Who is the owner or developer of Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD?
HCID No. 18 is the property owner/developer of record for Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD, per its TDLR project registration.
Who is the architect or design firm for Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD?
DCS Engineering, LLC is the design firm of record for Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD, according to its TDLR filing.
How much does Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD cost and how big is it?
Wastewater Treatment Plant Expansion From 0.775 MGD to 1.50 MGD has an estimated construction value of $1.8M and approximately 5,700 square feet (about $314/sqft), based on its TDLR filing.
Scope of Work
Construction of building to house electrical and mechanical equipments, a laboratory and a restroom
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
22505 Spring Stuebner Loop 1/2, Spring, TX, 77389
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 77389 (Spring)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Spring?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.