Funding type
This project is privately funded, on private land for private use.
Collinsville United Methodist Church Expansion
300 East Hughes Street, Collinsville, TX, 76233
Collinsville United Methodist Church Expansion is a new construction project at 300 East Hughes Street, Collinsville, in Grayson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $700K across about 4,000 sq ft.
- Estimated project value
- $700K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $175/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
31 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
334 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Collinsville United Methodist Church Expansion
Collinsville United Methodist Church is expanding its campus at 300 East Hughes Street in Collinsville with a new single-story multi-purpose building. The project, filed as the Collinsville United Methodist Church Expansion, involves the new construction of a 4,000 sq ft structure. The estimated cost for this development is $700,000.
The design firm of record is David Baca Studio, LLC dba BACA, while Darrell Glen Smith serves as the registered accessibility specialist. The project is privately funded on private land for private use. TDLR completed plan review in May 2025, and construction was scheduled to begin in June 2025 with a target completion date of May 2026.
Construction Status and Location
Although the scheduled completion date of May 2026 has passed, TDLR has not yet recorded a final inspection. Consequently, the current state of the site is not confirmed in the public record.
In terms of scale, the 4,000 sq ft size places this project below the median size of 8,000 sq ft for new construction filings in Grayson County. The estimated cost of $700,000 is also below the county median of $925,000. However, the calculated cost per square foot of $175 is above the county median of $135 per square foot.
The scheduled build window for this project is 334 days, which is longer than the county median of 242 days for similar new construction types. David Baca Studio, LLC dba BACA has six other TDLR-registered projects totaling $27,800,000, including facilities in Frisco, Austin, and Humble. The local area profile for ZIP 76233 indicates a population of about 3,604 and a median household income of $65,701.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76233 (Collinsville)
One email per change. Unsubscribe in one click. Privacy.
Collinsville United Methodist Church Expansion is a New Construction project located at 300 East Hughes Street in Collinsville, Texas. The project has an estimated value of $700K covering 4,000 sq ft. Collinsville United Methodist Church is the property owner and David Baca Studio, LLC dba BACA is the design firm of record. The project was registered with TDLR on May 1, 2025.
Frequently Asked Questions
Where is the Collinsville United Methodist Church expansion being built?
The expansion is located at 300 East Hughes Street in Collinsville, Grayson County.
What is the estimated cost and size of the new building?
The new single-story multi-purpose building is 4,000 sq ft with an estimated cost of $700,000. This works out to $175 per square foot.
Who is the design firm for this project?
The design firm of record is David Baca Studio, LLC dba BACA. Darrell Glen Smith is the registered accessibility specialist for the filing.
Is the construction complete?
TDLR has not yet recorded a final inspection. While the scheduled completion date was May 2026, the current state of the site is not confirmed in the public record.
How does this project compare to other Grayson County construction?
The cost is below the county median, and the size is below the median. However, the cost per square foot is above the county median, and the build window is longer than the median.
What is Collinsville United Methodist Church Expansion?
Collinsville United Methodist Church Expansion is a new construction project at 300 East Hughes Street in Collinsville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Expansion of existing church campus with a new single-story 4,000 sf multi-purpose building.
Is Collinsville United Methodist Church Expansion open in Collinsville?
Collinsville United Methodist Church Expansion was scheduled to finish construction in May 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Collinsville United Methodist Church Expansion located?
Collinsville United Methodist Church Expansion is located at 300 East Hughes Street, Collinsville, TX, 76233, in Grayson County.
Who is the owner or developer of Collinsville United Methodist Church Expansion?
Collinsville United Methodist Church is the property owner/developer of record for Collinsville United Methodist Church Expansion, per its TDLR project registration.
Who is the architect or design firm for Collinsville United Methodist Church Expansion?
David Baca Studio, LLC dba BACA is the design firm of record for Collinsville United Methodist Church Expansion, according to its TDLR filing.
How much does Collinsville United Methodist Church Expansion cost and how big is it?
Collinsville United Methodist Church Expansion has an estimated construction value of $700K and approximately 4,000 square feet (about $175/sqft), based on its TDLR filing.
Scope of Work
Expansion of existing church campus with a new single-story 4,000 sf multi-purpose building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
300 East Hughes Street, Collinsville, TX, 76233
Related Projects
Watch all construction in 76233 (Collinsville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Collinsville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.