DISRUPTIVE OFFICE FINISH OUT is a renovation/alteration project at 200 CRESCENT COURT, SUITE 1175, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $1.0M across about 6,304 sq ft.
Project has been completed and closed
DISRUPTIVE OFFICE FINISH OUT is a Renovation/Alteration project located at 200 CRESCENT COURT, SUITE 1175, Dallas, TX 75201 in Dallas, Texas. The project has an estimated value of $1.0M covering 6,304 sq ft. GPIF TC Owner, LLC is the property owner and GFF Design is the design firm of record. The project was registered with TDLR on May 2, 2025.
DISRUPTIVE OFFICE FINISH OUT is a renovation/alteration project at 200 CRESCENT COURT, SUITE 1175 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 6,304 SF. Interior reno of existing office suite including: demolition of existing interior walls,ceilings,electrical, plumbing fixtures, and construction of new interior walls, ceilings, lighting, power & equipment. No modification to bโฆ
Construction on DISRUPTIVE OFFICE FINISH OUT is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
DISRUPTIVE OFFICE FINISH OUT is located at 200 CRESCENT COURT, SUITE 1175, Dallas, TX, 75201, in Dallas County.
GPIF TC Owner, LLC is the property owner/developer of record for DISRUPTIVE OFFICE FINISH OUT, per its TDLR project registration.
GFF Design is the design firm of record for DISRUPTIVE OFFICE FINISH OUT, according to its TDLR filing.
DISRUPTIVE OFFICE FINISH OUT has an estimated construction value of $1.0M and approximately 6,304 square feet (about $159/sqft), based on its TDLR filing.
6,304 SF. Interior reno of existing office suite including: demolition of existing interior walls,ceilings,electrical, plumbing fixtures, and construction of new interior walls, ceilings, lighting, power & equipment. No modification to base building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 2, 2025
Review Complete
May 2, 2025
Inspection Complete
Feb 18, 2026
Closed
Jun 20, 2026
292d
Construction phase