Funding type
This project is privately funded, on private land for private use.
1001 Fannin LVL 2 - Conference Center in Houston, TX
1001 Fannin St STE 200, Houston, TX, 77002
1001 Fannin LVL 2 - Conference Center is a renovation/alteration project at 1001 Fannin St STE 200, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2025). The project has an estimated value of $800K across about 11,322 sq ft.
- Estimated project value
- $800K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,322 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $71/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
71 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
123 days after the preceding date shown.
Source: TDLR filing
View source record
📰About 1001 Fannin LVL 2 - Conference Center
The 1001 Fannin LVL 2 - Conference Center renovation at 1001 Fannin Street in Houston is complete. TDLR closed the project file in May 2025, marking the end of the accessibility review process for this construction. The project involved an interior renovation of 11,322 square feet within an existing office building to create a conference and amenity center.
FC Tower Property Partners served as the owner of record for this $800,000 project. The work was registered with TDLR in May 2025, with construction scheduled to begin in July 2025 and finish by November 2025. The registered accessibility specialist for the filing was Laura Fulkerson. Huitt-Zollars was the design firm of record, overseeing the alterations to the space.
Context and Scale
The estimated cost of $800,000 places this project above the Harris County median for renovation and alteration filings, which stands at $250,000. The scheduled build window of 123 days was longer than the county median of 92 days. The cost per square foot was $71, which is close to the county median of $80. This project is one of several registered by FC Tower Property Partners in Houston, including other renovations at the same address.
Huitt-Zollars has been involved in other TDLR-registered projects in Texas, including facilities in Aledo, Houston, and Amarillo. The Central Business District area, located in Harris County, has seen other construction activities, including new multifamily developments and renovations at nearby addresses. The ZIP code 77002 has a population of about 19,616 and a median household income of $85,436 according to Census estimates.
The TDLR status for this specific filing is Project Closed. This indicates that the accessibility review requirements associated with the construction were satisfied. The project is privately funded on private land for private use. No further construction activity is indicated in the TDLR record for this specific scope of work.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77002 (Houston)
One email per change. Unsubscribe in one click. Privacy.
1001 Fannin LVL 2 - Conference Center is a Renovation/Alteration project located at 1001 Fannin St STE 200, Houston, TX 77002 in Houston, Texas. The project has an estimated value of $800K covering 11,322 sq ft. FC TOWER PROPERTY PARTNERS is the property owner and Huitt-Zollars is the design firm of record. The project was registered with TDLR on May 5, 2025.
Frequently Asked Questions
Is the project at 1001 Fannin Street finished?
Yes, TDLR closed the project file in May 2025. This marks the end of the accessibility review process for the renovation of the second floor space.
Who was the owner of this renovation?
FC Tower Property Partners was the owner of record for the project. Huitt-Zollars served as the design firm for the interior renovation work.
What was the cost of the renovation?
The estimated cost for the 11,322 square foot renovation was $800,000. This places the project above the Harris County median cost for similar renovation filings.
What type of work was performed?
The scope included interior renovation of the second floor to include a conference and amenity center. It was classified as a Renovation/Alteration project.
Is the business open at this address?
The TDLR record confirms the construction file is closed. It does not provide information regarding current business operations or opening status for specific tenants.
What is 1001 Fannin LVL 2 - Conference Center?
1001 Fannin LVL 2 - Conference Center is a renovation/alteration project at 1001 Fannin St STE 200 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of second floor space within an existing office building to include a conference and amenity center.
Is 1001 Fannin LVL 2 - Conference Center open in Houston?
Construction on 1001 Fannin LVL 2 - Conference Center is complete — TDLR records show the project passed its required accessibility inspection in May 2025. The building is finished and very likely open.
Where is 1001 Fannin LVL 2 - Conference Center located?
1001 Fannin LVL 2 - Conference Center is located at 1001 Fannin St STE 200, Houston, TX, 77002, in Harris County.
Who is the owner or developer of 1001 Fannin LVL 2 - Conference Center?
FC TOWER PROPERTY PARTNERS is the property owner/developer of record for 1001 Fannin LVL 2 - Conference Center, per its TDLR project registration.
Who is the architect or design firm for 1001 Fannin LVL 2 - Conference Center?
Huitt-Zollars is the design firm of record for 1001 Fannin LVL 2 - Conference Center, according to its TDLR filing.
How much does 1001 Fannin LVL 2 - Conference Center cost and how big is it?
1001 Fannin LVL 2 - Conference Center has an estimated construction value of $800K and approximately 11,322 square feet (about $71/sqft), based on its TDLR filing.
Scope of Work
Interior renovation of second floor space within an existing office building to include a conference and amenity center.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1001 Fannin St STE 200, Houston, TX, 77002
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$27.5M totalRelated City Permits
Building permits found at or near this location
CREATE NEW 750 S/F 47TH FLOOR (IT) ROOM 1-50-1-B-A SP/FA 2021 IBC.
Watch all construction in 77002 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.