Project intelligenceTDLR TABS2025018451New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Huffman ISD New CTE & Hargrave High School Additions & Renovations

25400 Willy Lane, Huffman, TX, 77046

Opening ~Feb 2027Review Complete

Huffman ISD New CTE & Hargrave High School Additions & Renovations is a new construction project at 25400 Willy Lane, Huffman, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $51.0M across about 75,000 sq ft.

Estimated project value
$51.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
75,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$680/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 7, 2025662 days across supplied datesFeb 28, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    86 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    576 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Huffman ISD New CTE & Hargrave High School Additions & Renovations

Hargrave High School in Huffman, Texas, is the site of a major new construction project filed under the name Huffman ISD New CTE & Hargrave High School Additions & Renovations. The scope includes a new Career and Technical Education (CTE) building, additions to the existing high school structure, and associated interior renovations. This 75,000-square-foot expansion is estimated to cost $51,000,000, placing the project well above the typical scale of local construction filings.

Project Scope and Cost

The work is classified as New Construction and involves public funds. The estimated cost of $51,000,000 for 75,000 square feet results in a cost of $680 per square foot. This figure is significantly above the Harris County median of $88 per square foot for new construction projects. The total estimated cost is also in the top quarter of the 22,154 new construction filings registered in Harris County, where the median estimated cost is $750,000.

Huffman Independent School District is the owner of record for this project. The district has four other TDLR-registered projects in the area, including Huffman Elementary School, Huffman ISD Operations Center, Falcon Ridge Elementary School, and Huffman Middle School. These other projects total $29,325,000 and are all listed with review complete status. The Hargrave High School project is distinct in its scale and specific focus on CTE and general school renovations.

William T Winning is the registered accessibility specialist for this filing. The project was registered with TDLR in May 2025, and plan review was completed in the same month. The TDLR status is Review Complete. Construction is scheduled to start in August 2025 and is scheduled to finish in February 2027. This timeline represents a build window of 576 days, which is longer than the Harris County median of 221 days for similar projects.

The site is located at 25400 Willy Lane in Huffman, within Harris County. Census estimates for ZIP code 77046 show a population of about 1,873, with a median household income of $115,516. The housing stock consists of 1,312 units, with an even mix of owner- and renter-occupied homes. The median owner-occupied home value in the area is $276,400.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77046 (Huffman)

One email per change. Unsubscribe in one click. Privacy.

Huffman ISD New CTE & Hargrave High School Additions & Renovations is a New Construction project located at 25400 Willy Lane, Huffman, TX 77046 in Huffman, Texas. The project has an estimated value of $51.0M covering 75,000 sq ft. Huffman Independent School District is the property owner. The project was registered with TDLR on May 7, 2025.

Frequently Asked Questions

Is Hargrave High School open to the public?

The TDLR record tracks construction status, not business operations. The filing indicates construction is scheduled to start in August 2025 and is scheduled to finish in February 2027. It does not confirm if the school is open for enrollment or public access.

Who is building the new CTE facility at Hargrave High School?

Huffman Independent School District is the owner of record. William T Winning is the registered accessibility specialist listed on the TDLR filing for this new construction project in Huffman, Texas.

How much does the Hargrave High School renovation cost?

The estimated cost for the new CTE building, additions, and renovations is $51,000,000. This equates to $680 per square foot for the 75,000-square-foot project scope.

When will construction at Hargrave High School be completed?

According to the TDLR filing, construction is scheduled to start in August 2025 and is scheduled to finish in February 2027. Plan review was completed in May 2025.

What is the scope of the Hargrave High School project?

The scope includes a new CTE building at Hargrave High School, new additions to the existing school, and associated interior renovations. It is classified as New Construction work.

What is Huffman ISD New CTE & Hargrave High School Additions & Renovations?

Huffman ISD New CTE & Hargrave High School Additions & Renovations is a new construction project at 25400 Willy Lane in Huffman, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New CTE Building at Hargrave High School, with New Addition to Existing Hargrave High School and Associated Interior Renovations

Is Huffman ISD New CTE & Hargrave High School Additions & Renovations open in Huffman?

Huffman ISD New CTE & Hargrave High School Additions & Renovations is still under construction in Huffman, TX, with an estimated completion of Feb 2027 according to its TDLR registration.

Where is Huffman ISD New CTE & Hargrave High School Additions & Renovations located?

Huffman ISD New CTE & Hargrave High School Additions & Renovations is located at 25400 Willy Lane, Huffman, TX, 77046, in Harris County.

Who is the owner or developer of Huffman ISD New CTE & Hargrave High School Additions & Renovations?

Huffman Independent School District is the property owner/developer of record for Huffman ISD New CTE & Hargrave High School Additions & Renovations, per its TDLR project registration.

How much does Huffman ISD New CTE & Hargrave High School Additions & Renovations cost and how big is it?

Huffman ISD New CTE & Hargrave High School Additions & Renovations has an estimated construction value of $51.0M and approximately 75,000 square feet (about $680/sqft), based on its TDLR filing.

Scope of Work

New CTE Building at Hargrave High School, with New Addition to Existing Hargrave High School and Associated Interior Renovations

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

25400 Willy Lane, Huffman, TX, 77046

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77046 (Huffman)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.