Project intelligenceTDLR TABS2025018907New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bayside Intermediate New Drive

4430 Village Way, League City, TX, 77573

Construction complete · Sep 2026Project Closed

Bayside Intermediate New Drive is a new construction project at 4430 Village Way, League City, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $1.6M across about 34,500 sq ft.

Estimated project value
$1.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
34,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$46/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 13, 2025485 days across supplied datesSep 10, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    60 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    272 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    134 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77573 (League City)

One email per change. Unsubscribe in one click. Privacy.

Bayside Intermediate New Drive is a New Construction project located at 4430 Village Way, League City, TX 77573 in League City, Texas. The project has an estimated value of $1.6M covering 34,500 sq ft. Clear Creek Independent School District is the property owner and PBK Architects, Inc. is the design firm of record. The project was registered with TDLR on May 13, 2025.

Frequently Asked Questions

What is Bayside Intermediate New Drive?

Bayside Intermediate New Drive is a new construction project at 4430 Village Way in League City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New driveway and parking lot.

Is Bayside Intermediate New Drive open in League City?

Construction on Bayside Intermediate New Drive is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is Bayside Intermediate New Drive located?

Bayside Intermediate New Drive is located at 4430 Village Way, League City, TX, 77573, in Galveston County.

Who is the owner or developer of Bayside Intermediate New Drive?

Clear Creek Independent School District is the property owner/developer of record for Bayside Intermediate New Drive, per its TDLR project registration.

Who is the architect or design firm for Bayside Intermediate New Drive?

PBK Architects, Inc. is the design firm of record for Bayside Intermediate New Drive, according to its TDLR filing.

How much does Bayside Intermediate New Drive cost and how big is it?

Bayside Intermediate New Drive has an estimated construction value of $1.6M and approximately 34,500 square feet (about $46/sqft), based on its TDLR filing.

Scope of Work

New driveway and parking lot.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4430 Village Way, League City, TX, 77573

Location by street address

Watch all construction in 77573 (League City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in League City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.