This project is privately funded, on private land for private use.
Challenger School Independence Phase II in Plano, TX
10145 Independence Parkway, Plano, TX, 75025
Challenger School Independence Phase II is a additions to existing building project at 10145 Independence Parkway, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $9.5M across about 25,977 sq ft.
- Estimated project value
- $9.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 25,977 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $366/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
61 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
22 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Challenger School Independence Phase II
Challenger School Independence Phase II is complete. The two new classroom wings added to the existing facility at 10145 Independence Parkway in Plano passed their final TDLR accessibility inspection in August 2026. This project, registered with TDLR in May 2025, involved the addition of 25,977 sq ft of space to an existing school building in Collin County.
The construction work was privately funded by Challenger School Foundation, Inc. The design firm of record is Rees Associates, Inc. Marcela Abadi Rhoads served as the registered accessibility specialist. The estimated cost for the addition was $9,500,000, resulting in a cost of $366 per square foot.
Project Scope and Timeline
Plan review was completed in May 2025, and construction began in July 2025. The filing indicated a scheduled completion date of July 2026. The final inspection was passed in August 2026. The scheduled build window of 365 days is longer than the county median of 153 days for similar additions to existing buildings.
Regional Context and Comparisons
This project's estimated cost is above the county median for its type, placing it in the top quarter of 755 TDLR-registered additions in Collin County. The median estimated cost for these filings is $490,000, with a median size of 4,062 sq ft. The median cost per square foot for these projects is $149. Rees Associates, Inc. has three other TDLR-registered projects totaling $12,059,081, including a $9,359,081 project in Fairview and a $2,400,000 project in Plano.
Census estimates for ZIP code 75025 show a population of about 53,352 and a median household income of $135,398. The median owner-occupied home value is $466,700. Collin County unemployment was 4.4 percent in August 2026, lower than a year earlier. Other registered projects in the area include Rice Middle School and an Athletic and Picnic Pavilion.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75025 (Plano)
One email per change. Unsubscribe in one click. Privacy.
Challenger School Independence Phase II is a Additions to Existing Building project located at 10145 Independence Parkway, Plano, TX 75025 in Plano, Texas. The project has an estimated value of $9.5M covering 25,977 sq ft. Challenger School Foundation, Inc is the property owner and Rees Associates, Inc is the design firm of record. The project was registered with TDLR on May 15, 2025.
Frequently Asked Questions
Is the construction complete?
Yes. The project passed its final TDLR accessibility inspection in August 2026. The TDLR status is Inspection Complete.
Who is the owner of the project?
The owner of record is Challenger School Foundation, Inc. The project is privately funded on private land for private use.
What is the total square footage added?
The project added 25,977 sq ft to the existing building. This includes two new classroom wings.
Who designed the project?
Rees Associates, Inc. is the design firm of record. Marcela Abadi Rhoads was the registered accessibility specialist.
Is the business open?
The TDLR record indicates construction is complete. It does not confirm when the business opened to the public.
What is Challenger School Independence Phase II?
Challenger School Independence Phase II is a additions to existing building project at 10145 Independence Parkway in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of two new classroom wings to an existing school.
Is Challenger School Independence Phase II open in Plano?
Construction on Challenger School Independence Phase II is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.
Where is Challenger School Independence Phase II located?
Challenger School Independence Phase II is located at 10145 Independence Parkway, Plano, TX, 75025, in Collin County.
Who is the owner or developer of Challenger School Independence Phase II?
Challenger School Foundation, Inc is the property owner/developer of record for Challenger School Independence Phase II, per its TDLR project registration.
Who is the architect or design firm for Challenger School Independence Phase II?
Rees Associates, Inc is the design firm of record for Challenger School Independence Phase II, according to its TDLR filing.
How much does Challenger School Independence Phase II cost and how big is it?
Challenger School Independence Phase II has an estimated construction value of $9.5M and approximately 25,977 square feet (about $366/sqft), based on its TDLR filing.
Scope of Work
Addition of two new classroom wings to an existing school.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
10145 Independence Parkway, Plano, TX, 75025
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Design Firm
$455.4M totalWatch all construction in 75025 (Plano)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Plano?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.