Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
N. Frio Bicycle and Pedestrian Improvements
N. Frio St. from IH 10 to W. Houston St., San Antonio, TX, 78207
N. Frio Bicycle and Pedestrian Improvements is a renovation/alteration project at N. Frio St. from IH 10 to W. Houston St., San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $603K across about 4,700 sq ft.
- Estimated project value
- $603K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,700 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $128/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
381 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
426 days after the preceding date shown.
Source: TDLR filing
View source record
📰About N. Frio Bicycle and Pedestrian Improvements
The N. Frio Bicycle and Pedestrian Improvements project involves widening existing pavement to add bicycle lanes and reconstructing sidewalks on both sides of North Frio Street in San Antonio. The work covers a 4,700 sq ft stretch from Interstate 10 to West Houston Street in the Prospect Hill Area. With an estimated cost of $602,610, the project is scheduled to finish in August 2027, with construction starting in June 2026.
Lamb-Star Engineering, LLC serves as the design firm of record for this accessibility-focused alteration. Peter F Grojean is the registered accessibility specialist associated with the filing. The TDLR status is listed as Review Complete, having finished plan review in May 2025. This registration confirms the project meets the specific accessibility standards required for public infrastructure in Texas.
Project Scope and Cost Context
The scope explicitly includes widening pavement for bicycle lanes and sidewalk reconstruction. At $128 per square foot, this cost is above the Bexar County median of $85 for similar renovation and alteration filings. The total estimated cost of $602,610 places the project in the top quarter of costs for this type of work in the county, where the median is $250,000.
The scheduled build window of 426 days is longer than the county median of 103 days for comparable projects. This extended timeline reflects the complexity of integrating bicycle infrastructure with existing roadways in a dense urban area. The project involves public funds and is located on public land, ensuring it serves the broader community of San Antonio.
North Frio Street runs through a neighborhood with a population of about 54,128 residents in the 78207 ZIP code. The area is characterized by a high rate of renter-occupied housing, with a median household income of $30,655. Nearby businesses include H-E-B, Bazan Branch Library, and WIC Administrative Office, indicating a well-established commercial and residential mix that will benefit from improved pedestrian and bicycle access.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78207 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
N. Frio Bicycle and Pedestrian Improvements is a Renovation/Alteration project located at N. Frio St. from IH 10 to W. Houston St., San Antonio, TX 78207 in San Antonio, Texas. The project has an estimated value of $603K covering 4,700 sq ft. City of San Antonio Public Works is the property owner and Lamb-Star Engineering, LLC is the design firm of record. The project was registered with TDLR on May 16, 2025.
Frequently Asked Questions
When does the North Frio Street project finish?
The project is scheduled to finish in August 2027. Construction is set to begin in June 2026, following the completion of plan review in May 2025.
Who is building the bicycle lanes on North Frio?
The City of San Antonio Public Works is the owner of record. Lamb-Star Engineering, LLC is the design firm, and Peter F Grojean is the registered accessibility specialist.
What is the total cost of this project?
The estimated cost is $602,610. This figure is above the Bexar County median for renovation and alteration projects, which is $250,000.
Is the project currently under construction?
Construction is scheduled to start in June 2026. The TDLR record shows the status as Review Complete, with plan review finished in May 2025.
What specific improvements are planned for North Frio?
The scope includes widening existing pavement to add bicycle lanes and reconstructing sidewalks along both sides of the street between IH 10 and W. Houston St.
What is N. Frio Bicycle and Pedestrian Improvements?
N. Frio Bicycle and Pedestrian Improvements is a renovation/alteration project at N. Frio St. from IH 10 to W. Houston St. in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widen existing pavement to add bicycle lanes and reconstruct sidewalks along both sides of N. Frio St.
Is N. Frio Bicycle and Pedestrian Improvements open in San Antonio?
N. Frio Bicycle and Pedestrian Improvements is still under construction in San Antonio, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is N. Frio Bicycle and Pedestrian Improvements located?
N. Frio Bicycle and Pedestrian Improvements is located at N. Frio St. from IH 10 to W. Houston St., San Antonio, TX, 78207, in Bexar County.
Who is the owner or developer of N. Frio Bicycle and Pedestrian Improvements?
City of San Antonio Public Works is the property owner/developer of record for N. Frio Bicycle and Pedestrian Improvements, per its TDLR project registration.
Who is the architect or design firm for N. Frio Bicycle and Pedestrian Improvements?
Lamb-Star Engineering, LLC is the design firm of record for N. Frio Bicycle and Pedestrian Improvements, according to its TDLR filing.
How much does N. Frio Bicycle and Pedestrian Improvements cost and how big is it?
N. Frio Bicycle and Pedestrian Improvements has an estimated construction value of $603K and approximately 4,700 square feet (about $128/sqft), based on its TDLR filing.
Scope of Work
Widen existing pavement to add bicycle lanes and reconstruct sidewalks along both sides of N. Frio St.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
N. Frio St. from IH 10 to W. Houston St., San Antonio, TX, 78207
Related Projects
Watch all construction in 78207 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.