Funding type
This project is privately funded, on private land for private use.
Francis Energy in Clyde, TX
113 S Access Rd., Clyde, TX, 79510
Francis Energy is a new construction project at 113 S Access Rd., Clyde, in Callahan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $280K across about 547 sq ft.
- Estimated project value
- $280K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 547 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $512/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 25 days
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
6 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
25 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Francis Energy
Francis Energy filed a new construction project for an electric vehicle charging station at 113 S Access Rd. in Clyde, Texas. The facility is registered under the project name Francis Energy - Clyde, TX, and is associated with the Family Dollar location in Callahan County. The building footprint is 547 sq ft, with an estimated cost of $280,000.
The scope of work includes the installation of one utility transformer, one 1200A MCB switchgear, one 600kW Rectifier cabinet, and four single-port chargers. This infrastructure supports high-capacity charging for electric vehicles, distinct from the retail operations of the adjacent business. The project is privately funded on private land for private use.
Project Status and Timeline
Jeffrey A Gutknecht served as the registered accessibility specialist for this filing. Dewberry Engineers Inc is the design firm of record. The project was registered with TDLR in May 2025. Plan review was completed in May 2025, and construction was scheduled to start in May 2025. The filing indicated a completion date of June 2025. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
The estimated cost of $280,000 places this project below the county median for new construction filings in Callahan County. The median estimated cost for comparable projects in the county is $1,225,000. The scheduled build window of 25 days is shorter than the county median of 272 days. The cost per square foot is $512, which is above the county median of $212.
Regional Context
Francis Energy has three other TDLR-registered projects in Texas. These include a project in Santo valued at $320,000, a Travel Center project in Kilgore valued at $140,000, and a Best Western project in Colorado City valued at $150,000. Dewberry Engineers Inc has six other registered projects, including electric vehicle charging stations in Houston, Beaumont, and Fort Worth. The Clyde area also includes other registered construction projects, such as the Clyde JR High School and Clyde Elementary.
According to U.S. Census ACS 2023 five-year estimates for ZIP 79510, the population is about 8,135. The median household income is $71,032, and the median owner-occupied home value is $154,200. The Callahan County unemployment rate was 3.7 percent in August 2026.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79510 (Clyde)
One email per change. Unsubscribe in one click. Privacy.
Francis Energy is a New Construction project located at 113 S Access Rd. in Clyde, Texas. The project has an estimated value of $280K covering 547 sq ft. Francis Energy is the property owner and Dewberry Engineers Inc is the design firm of record. The project was registered with TDLR on May 20, 2025.
Frequently Asked Questions
Is the Family Dollar EV charging station open?
TDLR has not yet recorded a final inspection for this project. The filing lists a completion date of June 2025, but the current operational status is not confirmed in the public record.
Who owns the EV charging station in Clyde?
The owner of record is Francis Energy. The project is privately funded and located on private land for private use.
What is the size of the Clyde EV charging facility?
The facility is 547 sq ft. It includes one utility transformer, one 1200A MCB switchgear, one 600kW Rectifier cabinet, and four single-port chargers.
Which design firm worked on this project?
Dewberry Engineers Inc is the design firm of record. Jeffrey A Gutknecht was the registered accessibility specialist for the filing.
How much did the Clyde EV station cost to build?
The estimated cost is $280,000. This is below the Callahan County median for new construction, which is $1,225,000.
What is Francis Energy?
Francis Energy is a new construction project at 113 S Access Rd. in Clyde, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: of electric vehicle charging station. Install to include (1) utility transformer, (1) 1200A MCB switchgear, (1) 600kW Rectifier cabinet, and (4) single port chargers. 547 S
Is Francis Energy open in Clyde?
Francis Energy was scheduled to finish construction in Jun 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Francis Energy located?
Francis Energy is located at 113 S Access Rd., Clyde, TX, 79510, in Callahan County.
Who is the owner or developer of Francis Energy?
Francis Energy is the property owner/developer of record for Francis Energy, per its TDLR project registration.
Who is the architect or design firm for Francis Energy?
Dewberry Engineers Inc is the design firm of record for Francis Energy, according to its TDLR filing.
How much does Francis Energy cost and how big is it?
Francis Energy has an estimated construction value of $280K and approximately 547 square feet (about $512/sqft), based on its TDLR filing.
Scope of Work
of electric vehicle charging station. Install to include (1) utility transformer, (1) 1200A MCB switchgear, (1) 600kW Rectifier cabinet, and (4) single port chargers. 547 S
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
113 S Access Rd., Clyde, TX, 79510
Related Projects
Same Owner
$890K totalNearby Projects
Within 1 kmWatch all construction in 79510 (Clyde)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Clyde?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.