Walmart Pavement Rebuilt #1958-1003 in Rio Grande City, TX
4534 E US Highway 83, Rio Grande City, TX, 78582
Walmart Pavement Rebuilt #1958-1003 is a renovation/alteration project at 4534 E US Highway 83, Rio Grande City, in Starr County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $3.0M across about 348,480 sq ft.
- Estimated project value
- $3.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 348,480 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $9/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
6 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
20 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
91 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
103 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
306 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Walmart Pavement Rebuilt #1958-1003
The TDLR record for Walmart Supercenter #1958 in Rio Grande City has reached its final administrative stage. The state agency closed the project file in October 2026, marking the end of the accessibility review process for this construction. The filing, registered in May 2025, documents a renovation and alteration project with an estimated cost of $3,000,000.
Scope and Location
Located at 4534 E US Highway 83 in Starr County, the project involves the maintenance, rehabilitation, and replacement of existing site pavements. The facility covers 348,480 sq ft of area. The owner of record is Wal-Mart Stores Texas LLC, and the design firm of record is Kimley Horn Associates. The work is privately funded on private land for private use.
The scheduled build window was 91 days, starting in June 2025 with a planned completion in September 2025. Although the scheduled completion date has passed, the final inspection was not passed until December 2025. This timeline reflects the actual duration of the construction and review activities required by the state.
In the context of Starr County renovations, this project’s cost is above the county median for its type. The median estimated cost for similar filings in the county is $270,000, while this project is valued at $3,000,000. Conversely, the cost per square foot is $9, which is significantly below the county median of $109 per sq ft. The size of the project is also larger than the median size of 4,127 sq ft for comparable local filings.
This geographic classification is relevant for construction planning but does not impact the administrative status of the TDLR registration. The project is one of several registered by the same owner and design firm, indicating a pattern of commercial infrastructure investment in the region.
With the file closed in October 2026, the regulatory oversight for this specific pavement rehabilitation is complete. The record confirms that all required reviews and inspections were finalized, providing a definitive endpoint to the construction phase documented by the state.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78582 (Rio Grande City)
One email per change. Unsubscribe in one click. Privacy.
Walmart Pavement Rebuilt #1958-1003 is a Renovation/Alteration project located at 4534 E US Highway 83, Rio Grande City, TX 78582 in Rio Grande City, Texas. The project has an estimated value of $3.0M covering 348,480 sq ft. WAL-MART STORES TEXAS LLC is the property owner and Kimley Horn Associates is the design firm of record. The project was registered with TDLR on May 20, 2025.
Frequently Asked Questions
What work was performed at this Walmart location?
The project involved the maintenance, rehabilitation, and replacement of existing site pavements. It is classified as a renovation and alteration project with an estimated cost of $3,000,000.
Who is the owner and design firm?
The owner of record is Wal-Mart Stores Texas LLC. The design firm of record is Kimley Horn Associates, which has registered several other Walmart projects in Texas.
When was the project registered with TDLR?
The project was registered with the Texas Department of Licensing and Regulation in May 2025. Plan review was completed in the same month.
What is the current status of the TDLR file?
The TDLR status is Project Closed. The agency closed the project file in October 2026, following a final inspection passed in December 2025.
How does the cost compare to other local projects?
The $3,000,000 cost is above the Starr County median of $270,000 for similar renovations. However, the $9 per sq ft cost is below the county median of $109.
What is Walmart Pavement Rebuilt #1958-1003?
Walmart Pavement Rebuilt #1958-1003 is a renovation/alteration project at 4534 E US Highway 83 in Rio Grande City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project involves the maintenance (rehabilitation/replacement) of existing site pavements
Is Walmart Pavement Rebuilt #1958-1003 open in Rio Grande City?
Construction on Walmart Pavement Rebuilt #1958-1003 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.
Where is Walmart Pavement Rebuilt #1958-1003 located?
Walmart Pavement Rebuilt #1958-1003 is located at 4534 E US Highway 83, Rio Grande City, TX, 78582, in Starr County.
Who is the owner or developer of Walmart Pavement Rebuilt #1958-1003?
WAL-MART STORES TEXAS LLC is the property owner/developer of record for Walmart Pavement Rebuilt #1958-1003, per its TDLR project registration.
Who is the architect or design firm for Walmart Pavement Rebuilt #1958-1003?
Kimley Horn Associates is the design firm of record for Walmart Pavement Rebuilt #1958-1003, according to its TDLR filing.
How much does Walmart Pavement Rebuilt #1958-1003 cost and how big is it?
Walmart Pavement Rebuilt #1958-1003 has an estimated construction value of $3.0M and approximately 348,480 square feet (about $9/sqft), based on its TDLR filing.
Scope of Work
This project involves the maintenance (rehabilitation/replacement) of existing site pavements
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4534 E US Highway 83, Rio Grande City, TX, 78582
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$2.49B totalWatch all construction in 78582 (Rio Grande City)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rio Grande City?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.