Project intelligenceTDLR TABS2025019550Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

THAZ Basement Chapel Refresh

108 Denver Trail, Azle, TX, 76020

Target date passed (Nov 2025)Review Complete

THAZ Basement Chapel Refresh is a renovation/alteration project at 108 Denver Trail, Azle, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.4M across about 13,000 sq ft.

Estimated project value
$1.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
13,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$104/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 21, 2025181 days across supplied datesNov 18, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    155 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76020 (Azle)

One email per change. Unsubscribe in one click. Privacy.

THAZ Basement Chapel Refresh is a Renovation/Alteration project located at 108 Denver Trail, Azle, TX 76020 in Azle, Texas. The project has an estimated value of $1.4M covering 13,000 sq ft. Timothy O'Ferrall is the property owner and HDR Inc. is the design firm of record. The project was registered with TDLR on May 21, 2025.

Frequently Asked Questions

What is THAZ Basement Chapel Refresh?

THAZ Basement Chapel Refresh is a renovation/alteration project at 108 Denver Trail in Azle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish refresh of basement ORs, imaging, and Emergency Department. Refresh and modification to Chapel.

Is THAZ Basement Chapel Refresh open in Azle?

THAZ Basement Chapel Refresh was scheduled to finish construction in Nov 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is THAZ Basement Chapel Refresh located?

THAZ Basement Chapel Refresh is located at 108 Denver Trail, Azle, TX, 76020, in Tarrant County.

Who is the owner or developer of THAZ Basement Chapel Refresh?

Timothy O'Ferrall is the property owner/developer of record for THAZ Basement Chapel Refresh, per its TDLR project registration.

Who is the architect or design firm for THAZ Basement Chapel Refresh?

HDR Inc. is the design firm of record for THAZ Basement Chapel Refresh, according to its TDLR filing.

How much does THAZ Basement Chapel Refresh cost and how big is it?

THAZ Basement Chapel Refresh has an estimated construction value of $1.4M and approximately 13,000 square feet (about $104/sqft), based on its TDLR filing.

Scope of Work

Interior finish refresh of basement ORs, imaging, and Emergency Department. Refresh and modification to Chapel.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

108 Denver Trail, Azle, TX, 76020

Location by street address

Watch all construction in 76020 (Azle)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.