Funding type
This project is privately funded, on private land for private use.
Take 5 Oil Change in Dickinson, TX
484 W FM 646, Dickinson, TX, 77539
Take 5 Oil Change is a new construction project at 484 W FM 646, Dickinson, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $950K across about 1,676 sq ft.
- Estimated project value
- $950K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,676 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $567/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
144 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
133 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Take 5 Oil Change
Take 5 Oil Change plans to build a new 1,676 sq ft oil change facility at 484 W FM 646 in Dickinson, Texas. The project is registered with TDLR as a new construction effort with an estimated cost of $950,000. This private development is located in Galveston County and is privately funded for private use.
Construction Details and Timeline
V4 Lucky Inc. is the owner of record for this project, while WT Group serves as the design firm. Jeffery L Kelley is the registered accessibility specialist. TDLR completed plan review in May 2025. Construction was scheduled to begin in October 2025, with a completion date listed as February 2026 in the filing. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
The estimated cost of $950,000 places this project above the median estimated cost of $700,000 for new construction filings in Galveston County. The size of 1,676 sq ft is below the county median of 8,132 sq ft. The cost per square foot is $567, which is above the county median of $116. The scheduled build window of 133 days is shorter than the county median of 214 days for similar projects.
WT Group has registered six other projects with TDLR, totaling $15,699,755. These include projects in Laredo, Port Arthur, El Paso, Frisco, and Baytown. This classification indicates a lower risk compared to high-hazard areas, though it remains part of the National Flood Hazard Layer.
The surrounding area, ZIP code 77539, has a population of approximately 47,164 according to U.S. Census ACS 2023 estimates. The median household income in this area is $85,263, and the median owner-occupied home value is $246,400. Other registered projects in the Dickinson area include a Dael Development new construction, a Gas Station and C-Store, and a Memorial Hermann Convenient Care Center renovation. The Galveston County unemployment rate was 4.9 percent in August 2026, lower than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77539 (Dickinson)
One email per change. Unsubscribe in one click. Privacy.
Take 5 Oil Change is a New Construction project located at 484 W FM 646, Dickinson, TX 77539 in Dickinson, Texas. The project has an estimated value of $950K covering 1,676 sq ft. V4 Lucky Inc. is the property owner and WT Group is the design firm of record. The project was registered with TDLR on May 22, 2025.
Frequently Asked Questions
Is the Take 5 Oil Change in Dickinson open for business?
TDLR records show the project completed plan review in May 2025 but has not yet recorded a final inspection. Therefore, the business status is not confirmed by the public construction record.
Who is building the new Take 5 Oil Change facility?
V4 Lucky Inc. is the owner of record, and WT Group is the design firm. Jeffery L Kelley is the registered accessibility specialist for this TDLR-registered project.
What is the estimated cost of the new Dickinson oil change facility?
The estimated cost for the new construction of the 1,676 sq ft facility is $950,000. This figure is above the median cost for similar new construction projects in Galveston County.
Where exactly is the new Take 5 Oil Change located?
The facility is located at 484 W FM 646, Dickinson, TX 77539. It is situated in Galveston County within a FEMA moderate-risk flood zone.
When was the construction scheduled to finish?
The filing listed a completion date of February 2026. However, TDLR has not yet recorded a final inspection, so the actual completion status is not confirmed in the public record.
What is Take 5 Oil Change?
Take 5 Oil Change is a new construction project at 484 W FM 646 in Dickinson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of oil change facility
Is Take 5 Oil Change open in Dickinson?
Take 5 Oil Change was scheduled to finish construction in Feb 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Take 5 Oil Change located?
Take 5 Oil Change is located at 484 W FM 646, Dickinson, TX, 77539, in Galveston County.
Who is the owner or developer of Take 5 Oil Change?
V4 Lucky Inc. is the property owner/developer of record for Take 5 Oil Change, per its TDLR project registration.
Who is the architect or design firm for Take 5 Oil Change?
WT Group is the design firm of record for Take 5 Oil Change, according to its TDLR filing.
How much does Take 5 Oil Change cost and how big is it?
Take 5 Oil Change has an estimated construction value of $950K and approximately 1,676 square feet (about $567/sqft), based on its TDLR filing.
Scope of Work
New construction of oil change facility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
484 W FM 646, Dickinson, TX, 77539
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Design Firm
$82.4M totalWatch all construction in 77539 (Dickinson)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dickinson?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.