Jamestown Square Phase 1 Infrastructure in Sherman, TX
NW of intersection of Akers Road and U.S. 75, Sherman, TX, 75090
Jamestown Square Phase 1 Infrastructure is a new construction project at NW of intersection of Akers Road and U.S. 75, Sherman, in Grayson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.8M across about 958,320 sq ft.
- Estimated project value
- $3.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 958,320 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $4/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
454 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
31 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Jamestown Square Phase 1 Infrastructure
Jamestown Square Phase 1 Infrastructure is a new construction project located northwest of the intersection of Akers Road and U.S. 75 in Sherman, Grayson County. The development covers 958,320 square feet of site area, with an estimated cost of $3,783,460. This scope includes the construction of two public roads, public utilities, and a public sidewalk, along with the installation of two TXDOT deceleration lanes. The project is registered with TDLR under the TABS program, with Blair Baker serving as the registered accessibility specialist.
Cope Equities, LLC is the owner and developer of record for this phase. Kimley-Horn is the design firm of record, responsible for the project's planning and design documentation. The filing indicates that construction began in February 2024. TDLR completed plan review in May 2025. Although the scheduled completion date on the filing was June 2025, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
The project involves public funds, public land, or is a Federally funded roadway project, distinguishing it from purely private developments. The estimated cost per square foot is $4, which is below the county median of $135 per square foot for new construction filings in Grayson County. The total estimated cost of $3,783,460 is above the county median of $925,000, placing it in the top quarter of similar filings. The scheduled build window of 485 days is longer than the county median of 242 days.
Cope Equities, LLC has three other TDLR-registered projects totaling $21,576,056, including a $21,250,000 project in Kaufman and a $226,056 project in Princeton. Kimley-Horn has six other TDLR-registered projects totaling $196,845,395, with notable projects in Vernon and Panhandle. The surrounding area, ZIP code 75090, has a population of about 26,273 and a median household income of $58,586 according to Census estimates.
Other registered projects in the immediate area include several Texas Instruments SM1 buildings, such as the Fab2 Building, Site, Fab1/Support Building, Admin Building, and Garage. These are all classified as new construction. The presence of multiple large-scale infrastructure and industrial projects in Sherman suggests a period of significant development in Grayson County. The project's status remains in review complete, with no final inspection recorded in the TDLR database.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75090 (Sherman)
One email per change. Unsubscribe in one click. Privacy.
Jamestown Square Phase 1 Infrastructure is a New Construction project located at NW of intersection of Akers Road and U.S. 75 in Sherman, Texas. The project has an estimated value of $3.8M covering 958,320 sq ft. Cope Equities, LLC is the property owner and Kimley-Horn is the design firm of record. The project was registered with TDLR on May 27, 2025.
Frequently Asked Questions
Is Jamestown Square Phase 1 Infrastructure open?
The TDLR record shows TDLR has not yet recorded a final inspection. Construction was scheduled to finish in June 2025, but the current state of the site is not confirmed in the public record.
Who is the developer for Jamestown Square Phase 1?
Cope Equities, LLC is the owner and developer of record for this project. Kimley-Horn is the design firm of record.
What is the scope of work for this project?
The scope includes construction of two public roads, public utilities, and a public sidewalk, and installation of two TXDOT deceleration lanes.
Where is the project located?
The project is located northwest of the intersection of Akers Road and U.S. 75 in Sherman, Grayson County.
What is the estimated cost of the project?
The estimated cost is $3,783,460. This is above the Grayson County median for new construction filings.
What is Jamestown Square Phase 1 Infrastructure?
Jamestown Square Phase 1 Infrastructure is a new construction project at NW of intersection of Akers Road and U.S. 75 in Sherman, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of 2 public roads, public utilities, and public sidewalk, and installation of two TXDOT deceleration lanes
Is Jamestown Square Phase 1 Infrastructure open in Sherman?
Jamestown Square Phase 1 Infrastructure was scheduled to finish construction in Jun 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Jamestown Square Phase 1 Infrastructure located?
Jamestown Square Phase 1 Infrastructure is located at NW of intersection of Akers Road and U.S. 75, Sherman, TX, 75090, in Grayson County.
Who is the owner or developer of Jamestown Square Phase 1 Infrastructure?
Cope Equities, LLC is the property owner/developer of record for Jamestown Square Phase 1 Infrastructure, per its TDLR project registration.
Who is the architect or design firm for Jamestown Square Phase 1 Infrastructure?
Kimley-Horn is the design firm of record for Jamestown Square Phase 1 Infrastructure, according to its TDLR filing.
How much does Jamestown Square Phase 1 Infrastructure cost and how big is it?
Jamestown Square Phase 1 Infrastructure has an estimated construction value of $3.8M and approximately 958,320 square feet (about $4/sqft), based on its TDLR filing.
Scope of Work
Construction of 2 public roads, public utilities, and public sidewalk, and installation of two TXDOT deceleration lanes
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
NW of intersection of Akers Road and U.S. 75, Sherman, TX, 75090
Related Projects
Same Owner
$25.4M totalWatch all construction in 75090 (Sherman)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Sherman?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.