CCISD Parking Lot Improvements Project 3-Hope High School in Port Lavaca, TX
900 N Virginia St, Port Lavaca, TX, 77979
CCISD Parking Lot Improvements Project 3-Hope High School is a new construction project at 900 N Virginia St, Port Lavaca, in Calhoun County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $123K across about 3,650 sq ft.
- Estimated project value
- $123K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,650 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $34/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
210 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
176 days after the preceding date shown.
Source: TDLR filing
View source record
📰About CCISD Parking Lot Improvements Project 3-Hope High School
The Hope High School parking lot improvement project in Port Lavaca is complete. The new concrete surface spans 3,650 square feet at 900 N Virginia St. The project passed its final TDLR accessibility inspection in June 2026, confirming that the construction work has finished.
Calhoun County ISD is the owner of record for this new construction filing. The work involved the construction of a concrete parking lot, a specific scope of work that distinguishes it from broader facility renovations. Urban Engineering served as the design firm of record, guiding the project through plan review and into completion.
The estimated cost for the project was $123,252. This figure places the project below the median estimated cost of $600,000 for similar new construction filings in Calhoun County. The cost per square foot was $34, which is below the county median of $101 per square foot for comparable projects.
Tim Mullins was the registered accessibility specialist associated with the filing. The project was registered with TDLR in May 2025, and plan review was completed in the same month. Construction started in May 2025, with a scheduled completion date of December 2025 listed on the original filing. The actual final inspection occurred in June 2026, marking the official end of the construction timeline.
Calhoun County ISD has six other TDLR-registered projects totaling $3,559,300 in the region. These include projects in Seadrift and Port Lavaca, such as the HJM Elementary and Calhoun High School improvements. Urban Engineering has also designed six other registered projects, including Nautical Landings Marina and Bill Sanders Park-Swan Point, totaling $1,787,455.
The location is in ZIP code 77979, where the U.S. Census estimates a population of about 16,179 and a median household income of $68,877. The area is predominantly owner-occupied, with a median home value of $137,700. This infrastructure improvement supports the existing school facilities in this community.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77979 (Port Lavaca)
One email per change. Unsubscribe in one click. Privacy.
CCISD Parking Lot Improvements Project 3-Hope High School is a New Construction project located at 900 N Virginia St, Port Lavaca, TX 77979 in Port Lavaca, Texas. The project has an estimated value of $123K covering 3,650 sq ft. Calhoun County ISD is the property owner and Urban Engineering is the design firm of record. The project was registered with TDLR on May 29, 2025.
Frequently Asked Questions
Is the Hope High School parking lot construction finished?
Yes, the project passed its final TDLR accessibility inspection in June 2026. The construction is complete, and the new concrete parking lot is finished according to the TDLR records.
Who is the owner of the Hope High School parking project?
Calhoun County ISD is the owner of record for this project. Urban Engineering was the design firm, and Tim Mullins was the registered accessibility specialist.
What was the cost of the new parking lot?
The estimated cost was $123,252 for 3,650 square feet of new concrete construction. This cost is below the median for similar new construction projects in Calhoun County.
When did the project start and finish?
Construction started in May 2025. The final TDLR accessibility inspection was passed in June 2026, confirming the project's completion.
Is Hope High School open for business?
The TDLR record confirms the construction of the parking lot is complete. It does not provide information on the school's operational status or opening hours.
What is CCISD Parking Lot Improvements Project 3-Hope High School?
CCISD Parking Lot Improvements Project 3-Hope High School is a new construction project at 900 N Virginia St in Port Lavaca, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The construction of a concrete parking lot.
Is CCISD Parking Lot Improvements Project 3-Hope High School open in Port Lavaca?
Construction on CCISD Parking Lot Improvements Project 3-Hope High School is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is CCISD Parking Lot Improvements Project 3-Hope High School located?
CCISD Parking Lot Improvements Project 3-Hope High School is located at 900 N Virginia St, Port Lavaca, TX, 77979, in Calhoun County.
Who is the owner or developer of CCISD Parking Lot Improvements Project 3-Hope High School?
Calhoun County ISD is the property owner/developer of record for CCISD Parking Lot Improvements Project 3-Hope High School, per its TDLR project registration.
Who is the architect or design firm for CCISD Parking Lot Improvements Project 3-Hope High School?
Urban Engineering is the design firm of record for CCISD Parking Lot Improvements Project 3-Hope High School, according to its TDLR filing.
How much does CCISD Parking Lot Improvements Project 3-Hope High School cost and how big is it?
CCISD Parking Lot Improvements Project 3-Hope High School has an estimated construction value of $123K and approximately 3,650 square feet (about $34/sqft), based on its TDLR filing.
Scope of Work
The construction of a concrete parking lot.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
900 N Virginia St, Port Lavaca, TX, 77979
Related Projects
Same Owner
$95.5M totalWatch all construction in 77979 (Port Lavaca)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Port Lavaca?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.