Project intelligenceTDLR TABS2025020001Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Conveyance Replacement at Terminal E in Dallas, TX

2610 N International Parkway, Dallas, TX, 75261

Target date passed (Aug 2026)Review Complete

Conveyance Replacement at Terminal E is a renovation/alteration project at 2610 N International Parkway, Dallas, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $500K across about 400 sq ft.

Estimated project value
$500K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.25K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 29, 2025429 days across supplied datesAug 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    64 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Conveyance Replacement at Terminal E

Dallas Fort Worth International Airport Terminal E is undergoing a specific renovation project filed as Conveyance Replacement at Terminal E. Located at 2610 N International Parkway in Dallas, this work involves replacing the existing elevator with a new unit within the current shaft. The project is registered with TDLR as a Renovation/Alteration type, with a registered accessibility specialist named Blair Baker overseeing the compliance aspects of the build.

The estimated cost for this elevator replacement is $500,000. The scope covers 400 sq ft of work, resulting in a computed cost of $1,250 per sq ft. This figure is above the county median of $79 per sq ft for similar renovation filings in Tarrant County. The scheduled build window is 365 days, which is longer than the county median of 92 days for comparable projects.

Dallas Fort Worth International Airport is the owner of record for this work. Gresham Smith serves as the design firm of record. The project involves public funds and is situated on public land. TDLR completed the plan review in May 2025, and the registration was also finalized in that month. Construction was scheduled to begin in August 2025, with a completion date set for August 2026.

Although the filing indicates a completion date of August 2026, TDLR has not yet recorded a final inspection. This means the current state of the site is not confirmed in the public record. The status remains Review Complete, but the physical completion of the elevator replacement is not verified by the regulatory body.

Dallas Fort Worth International Airport has six other TDLR-registered projects totaling $406,303,522. These include the DFW Logistics Hub and various terminal improvements. Gresham Smith has six other registered projects totaling $161,427,062, including facilities in Conroe and Denison. Other registered projects in the immediate area include renovations at DFW Terminal D and E, Terminal B, and Terminal A. Businesses near this site include the Delta Sky Club, United Club, and Chili's Grill & Bar.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75261 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Conveyance Replacement at Terminal E is a Renovation/Alteration project located at 2610 N International Parkway, Dallas, TX 75261 in Dallas, Texas. The project has an estimated value of $500K covering 400 sq ft. Dallas Fort Worth International Airport is the property owner and Gresham Smith is the design firm of record. The project was registered with TDLR on May 29, 2025.

Frequently Asked Questions

What is the scope of work for Terminal E?

The scope of work involves replacing the existing elevator with a new elevator in the existing shaft. This is a Renovation/Alteration project focused on accessibility improvements at the airport terminal.

Who is the design firm for this project?

Gresham Smith is the design firm of record for the Conveyance Replacement at Terminal E project. They are responsible for the design aspects of the elevator replacement work.

What is the estimated cost of the renovation?

The estimated cost for the elevator replacement is $500,000. This covers 400 sq ft of work, with a computed cost of $1,250 per sq ft, which is above the county median for similar filings.

Is the project complete?

TDLR has not yet recorded a final inspection. While the filing listed an August 2026 completion date, the public record does not confirm that the site work is finished.

Who is the owner of the project?

Dallas Fort Worth International Airport is the owner and developer of record for this renovation project at Terminal E.

What is Conveyance Replacement at Terminal E?

Conveyance Replacement at Terminal E is a renovation/alteration project at 2610 N International Parkway in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace existing elevator with new elevator in existing shaft.

Is Conveyance Replacement at Terminal E open in Dallas?

Conveyance Replacement at Terminal E was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Conveyance Replacement at Terminal E located?

Conveyance Replacement at Terminal E is located at 2610 N International Parkway, Dallas, TX, 75261, in Tarrant County.

Who is the owner or developer of Conveyance Replacement at Terminal E?

Dallas Fort Worth International Airport is the property owner/developer of record for Conveyance Replacement at Terminal E, per its TDLR project registration.

Who is the architect or design firm for Conveyance Replacement at Terminal E?

Gresham Smith is the design firm of record for Conveyance Replacement at Terminal E, according to its TDLR filing.

How much does Conveyance Replacement at Terminal E cost and how big is it?

Conveyance Replacement at Terminal E has an estimated construction value of $500K and approximately 400 square feet (about $1.25K/sqft), based on its TDLR filing.

Scope of Work

Replace existing elevator with new elevator in existing shaft.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2610 N International Parkway, Dallas, TX, 75261

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75261 (Dallas)