Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Conveyance Replacement at Terminal B
2141 S International Parkway, Dallas, TX, 75261
Conveyance Replacement at Terminal B is a renovation/alteration project at 2141 S International Parkway, Dallas, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.0M across about 400 sq ft.
- Estimated project value
- $2.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 400 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $5.00K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
64 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source record
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75261 (Dallas)
One email per change. Unsubscribe in one click. Privacy.
Conveyance Replacement at Terminal B is a Renovation/Alteration project located at 2141 S International Parkway, Dallas, TX 75261 in Dallas, Texas. The project has an estimated value of $2.0M covering 400 sq ft. Dallas Fort Worth International Airport is the property owner and Gresham Smith is the design firm of record. The project was registered with TDLR on May 29, 2025.
Frequently Asked Questions
What is Conveyance Replacement at Terminal B?
Conveyance Replacement at Terminal B is a renovation/alteration project at 2141 S International Parkway in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace four (4) existing elevators with new elevators in existing shafts. Replace one (1) existing escalator with new escalator in new enclosure.
Is Conveyance Replacement at Terminal B open in Dallas?
Conveyance Replacement at Terminal B was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Conveyance Replacement at Terminal B located?
Conveyance Replacement at Terminal B is located at 2141 S International Parkway, Dallas, TX, 75261, in Tarrant County.
Who is the owner or developer of Conveyance Replacement at Terminal B?
Dallas Fort Worth International Airport is the property owner/developer of record for Conveyance Replacement at Terminal B, per its TDLR project registration.
Who is the architect or design firm for Conveyance Replacement at Terminal B?
Gresham Smith is the design firm of record for Conveyance Replacement at Terminal B, according to its TDLR filing.
How much does Conveyance Replacement at Terminal B cost and how big is it?
Conveyance Replacement at Terminal B has an estimated construction value of $2.0M and approximately 400 square feet (about $5.00K/sqft), based on its TDLR filing.
Scope of Work
Replace four (4) existing elevators with new elevators in existing shafts. Replace one (1) existing escalator with new escalator in new enclosure.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2141 S International Parkway, Dallas, TX, 75261
Related Projects
Same Owner
$707.5M totalWatch all construction in 75261 (Dallas)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dallas?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.